My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05112
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD05112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:48:18 PM
Creation date
10/5/2006 1:16:10 AM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
536
County
Boulder
Community
Boulder County and Incorporated Areas
Basin
South Platte
Title
Flood Insurance Study - Boulder County, CO and Incorporated Areas Volume I
Date
6/1/1995
Designation Date
11/1/2000
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />performed by various engineering firms for the purposes of <br />floodplain evaluation and are discussed in Section 7.0. <br /> <br />The hydrologic and hydraulic analyses for the original study for <br />the City of Boulder were performed by the U.S. Army Corps of <br />Bngineers (USACB), for FBMA under Interagency Agreement No. IAA-H- <br />15-72, Project Order Nos. 2 and 3, Amendment No.1. This work was <br />completed in October 1975. <br /> <br />Revised hydrologic and hydraulic analyses for the ci ty of Boulder <br />in the area of the confluence of Boulder and South Boulder Creeks <br />were completed in July 1982 'by Leonard Rice Consulting Water <br />Engineers and were incorporated into this study. This is a result <br />of channelization projects on South Boulder Creek and Dry Creek in <br />the Flatiron Industrial Park area. <br /> <br />l <br /> <br />Revised hydrologic and hydraulic analyses for the City of Boulder <br />for Boulder Creek were completed in January 1983 by Muller <br />Engineering Co., Inc., and were incorporated into this study. <br /> <br />Revised hydrologic and hydraulic analyses for the City of Boulder <br />for Wonderland, Fourmile Canyon, Skunk Canyon, Bear Canyon, <br />Twomile, and Goose Creeks for the study reaches outlined in Section <br />2.1 were performed by MSM/SP Group, for FEMA, under Contract <br />No. EMW-C-0709. This work wllS completed in April 1985. <br /> <br />Revised hydrologic and hydraulic analyses for the City of Boulder <br />for Sunshine Canyon, Bear Canyon, Gregory Canyon, Skunk Canyon, <br />Bluebell Canyon, and Fourmile Canyon Creeks and Kings Gulch were <br />done by Greenhorne and O'Mara,' Inc. (G&O). A revised hydraulic <br />analysis for South Boulder Creek was completed in July 1986 by G&O, <br />and was incorporated into this study. <br /> <br />The hydrologic and hydraulic analyses for the City of Lafayette and <br />the Towns of Jamestown, Lyons, Nederland, and Superior were <br />performed by Howard, Needles, Tammen & Bergendorff, for FBMA, under <br />Contract No. H-40l6. This work, which was completed in February <br />1978, covered all significant flooding sources affecting Lafayette, <br />Jamestown, Lyons, Nederland, and. Superior. <br /> <br />The hydrologic and hydraulic analyses for the initial study for the <br />City of Longmont were performed by Gingery Associates, Inc., for <br />FBMA, under Contract No. H-37l6. That work was completed in March <br />1976. <br /> <br />The additional hydrologic and hydraulic analyses for the City of <br />Longmont for the revised study were performed by Gingery <br />Associates, Inc., Simons, Lee IInd Associates, and Water Resources <br />Consultants, Inc., for the Colorado Water Conservation Board <br />(CWCB), as reported in floodplain information reports for Lefthand <br />Creek (References 1 and 2), and for Dry Creek No. 1 and St. Vrain <br />Creek (References 3 and 4, respectively). <br /> <br />f <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.