My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05088
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD05088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:48:13 PM
Creation date
10/5/2006 1:15:20 AM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Community
Arvada
Stream Name
Hidden Lake, Bates Lake
Basin
South Platte
Title
Major Drainageway Planning
Date
11/1/1975
Prepared For
Urban Drainage and Flood Control District, Arvada and Adams County
Prepared By
Hydro-Triad, LTD.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1-7 <br /> <br />sufficient to handle developed basin runoff from about the 10 year <br />storm. Downstream of 64th Avenue, the improvements are adequate for <br />the 100 year storm with and without improvements to Hidden Lake. <br />Improvements to Hidden Lake itself would allow for increased <br />land usage for the developments presently proposed downstream and <br />therefore, this construction is recommended next. <br />Finally, the Bates Lake area has minimal existing problems due <br />to the essentially undeveloped downstream area and therefore, the <br />construction of these improvements is more dependent upon the <br />priorities within Arvada. <br />
The URL can be used to link to this page
Your browser does not support the video tag.