Laserfiche WebLink
<br />I <br /> <br />I <br />I <br /> <br />II <br />I <br />II <br />I <br /> <br />Table 31. Alternative 2, Cooper Slough Reach 1 Quantities and <br />Cost Estimate for 10-Year Design Channel Improvements <br /> <br />Table 32. Alternative 2, Cooper Slough Reach 1 Quantities and <br />Cost Estimate for 50-Year Design Channel Improvements <br /> <br />Unit Cost <br /> <br />Total <br /> <br />I <br /> <br />Item <br /> <br />Quantity <br />16,000 cubic yards <br />1,000 cubic yards <br />200 cubic yards <br />30 linear feet <br />2,000 linear feet <br />150,000 square feet <br />1,200 cubic yards <br />1 each <br />1,400 linear feet <br /> <br />16 <br /> <br />Excavation <br /> <br />$ <br /> <br />3 <br /> <br />I <br /> <br />Fill <br /> <br />2 <br /> <br />I <br /> <br />Riprap <br /> <br />50 <br /> <br />3 - 4' X 10' box <br />culverts <br /> <br />1,500 <br /> <br />I <br /> <br />Trickle channel <br /> <br />34 <br /> <br />I <br /> <br />Seeding <br /> <br />0.08 <br /> <br />Concrete <br /> <br />250 <br /> <br />I <br /> <br />Diversion <br />structure <br /> <br />lump sum <br /> <br />I <br /> <br />Fencing <br /> <br />TOTAL CONSTRUCTION COST <br /> <br />I <br />I <br /> <br />Engineering & contingencies (35 percent of construction cost) <br /> <br />Land (6.5 acres @ $10,000) <br /> <br />Fiscal, legal and administration (5 percent of construction, engi- <br />neering & contingencies, & land) <br /> <br />I <br /> <br />TOTAL COST <br /> <br />I <br /> <br />Annual Cost: 50-year life, 7-3/8 percent <br /> <br />I <br /> <br />Operation and maintenance <br /> <br />TOTAL ANNUAL COST <br /> <br />I <br /> <br />I <br /> <br />Item Quantity Unit Cost <br />Excavation 20,300 cubic yards $ 3 <br />Fill 11,000 cubic yards 2 <br />Riprap 300 cubic yards 50 <br />4 - 6' x 10' box culverts 30 linear feet 2,300 <br />Trickle channel 2,000 linear feet 34 <br />Seeding 225,000 square feet 0.08 <br />Concrete 1,BOO cubic yards 250 <br />Diversion <br />structure 1 each Lump Sum <br />Fencing 1,400 linear feet 16 <br />TOTAL CONSTRUCTION COST <br /> <br />I <br /> <br />$ 48,000 <br /> 2,000 <br /> 10,000 <br /> 45,000 <br /> 6B,000 <br /> 12,000 <br /> 300,000 <br /> 2,000 <br /> 22,400 <br />$509,400 <br /> 178,300 <br /> 65,000 <br /> 37,600 <br />$790,300 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Engineering & contingencies (35 percent of construction cost) <br /> <br />Land (8 acres @ $10,000) <br /> <br />I <br /> <br />Fiscal, legal and administration (5 percent of construction, engi- <br />neering & contingencies, & land) <br /> <br />I <br /> <br />TOTAL COST <br /> <br />60,000 <br /> <br />I <br /> <br />Annual Cost: 50-year life, 7-3/B percent <br /> <br />Operation and maintenance <br /> <br />1,800 <br /> <br />I <br /> <br />TOTAL ANNUAL COST <br /> <br />$ 61,800 <br /> <br /> Total <br />$ 60,900 <br /> 22,000 <br /> 15,000 <br /> 69,000 <br /> 68,000 <br /> lB,OOO <br /> 450,000 <br /> 2,000 <br /> 22,400 <br />$ 727,300 <br /> 254,500 <br /> 80,000 <br /> 53,100 <br />$1,114,900 <br /> 84,700 <br /> 1,BOO <br />$ 86,500 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />74 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />75 <br /> <br />I <br />