Laserfiche WebLink
<br />1 <br /> <br />I <br />I <br /> <br />1 <br /> <br />I <br /> <br />Table 29. Alternatives 2 and 3, Boxelder Creek Reach 2 and 3, <br />Channel Crossing Improvements at Lake Canal and <br />Larimer-Weld Ditch (not included in economic analysis). <br /> <br />Table 30. Alternatives 2 and 3, Cooper Slough Reach 2 <br />Detention Storage QuantitieA and C0St <br />Estimate for Pond West of Cooper Slough <br /> <br />1 <br /> <br />Quantity <br /> <br />Unit Cost <br /> <br />Total <br /> <br />I <br /> <br />Total <br /> <br />I <br /> <br />Item <br /> <br />1 <br /> <br />1500 <br /> <br />$ 30,000 <br /> <br />1 <br /> <br />Item Quantity Unit Cost <br />Excavation 108,000 cubic yards $ 3 <br />Fill 3,600 cubic yards 2 <br />4' CMP 680 linear feet 40 <br />Trickle channel 1,200 linear feet 34 <br />Riprap 300 cubic yards 50 <br />Seeding 610,000 square feet 0.08 <br /> <br />20 linear feet <br /> <br />$ <br /> <br />Three 4 x 10 box culverts <br /> <br />I <br /> <br />Eight 4 x 12 box culverts <br /> <br />150 linear feet <br /> <br />4000 <br /> <br />TOTAL CONSTRUCTION COST <br /> <br />I <br /> <br />Engineering & contingencies (35 percent of construction cost) <br /> <br />Fiscal, legal and administration (5 percent of construction, engi- <br />neering & contingencies, & land) <br /> <br />I <br /> <br />TOTAL COST <br /> <br />I <br /> <br />Annual Cost: 50-year life, 7-3/B percent <br /> <br />Operation and maintenance <br /> <br />I <br />I <br /> <br />TOTAL ANNUAL COST <br /> <br />600,000 <br /> <br />$630,000 <br /> <br />I <br /> <br />220,000 <br /> <br />I <br />1 <br /> <br />42,500 <br /> <br />$893,000 <br /> <br />TOTAL CONSTRUCTION COST <br /> <br />67,BOO <br /> <br />I <br /> <br />Engineering & contingencies (35 percent of construction cost) <br /> <br />500 <br /> <br />$ 58,300 <br /> <br />I <br /> <br />Land Acquisition (14.0 acres @ $20,000) <br /> <br />Fiscal, legal and administration (5 percent of construction, engi- <br />neering & contingencies, & land) <br /> <br />I <br /> <br />I <br />I <br /> <br />1 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />72 <br /> <br />. <br /> <br />I <br />1 <br /> <br />TOTAL COST <br /> <br />Annual Cost: 50-year life, 7-3/8 percent <br /> <br />I <br /> <br />Operation and maintenance <br /> <br />TOTAL ANNUAL COST <br /> <br />I <br /> <br />$324,000 <br /> <br />7,200 <br /> <br />27,200 <br /> <br />40,800 <br /> <br />15,000 <br /> <br />48,800 <br /> <br />$463,000 <br /> <br />162,100 <br /> <br />280,000 <br /> <br />45,300 <br /> <br />$950,400 <br /> <br />72,100 <br /> <br />840 <br /> <br />$ 72 ,940 <br /> <br />,I <br /> <br />I <br /> <br />'. <br /> <br />I <br /> <br />73 <br /> <br />I <br />