Laserfiche WebLink
<br /> <br />BRIEFING PAPER <br /> <br />FOR DECISIONMAKERS <br /> <br />Multi-objective Hazard Mitigation Management Planning Workshop <br />Vermillion River Basin, South Dakota <br /> <br />Following widespread flooding in 1993, the TLC Water Project District in the Vermillion River Basin in South <br />Dakota submitted a pre-application notification for a hazard mitigation grant for a "Feasibility Study of Flood <br />Control Alternatives" for the 2,185-square-mile basin. This is about 25% of the total area declared a <br />Presidential disaster area in the state. The Rivers, Trails and Conservation Assistance (RTCA) Program of the National <br />Park Service (NPS) and the Mitigation Division of the Federal Emergency Management Agency (FEMA) were at the <br />same time discussing ways that the two agencies could work in partnership with others to reduce or eliminate the long- <br />term risk to human life and property from hazards. Discussions were held with the South Dakota Division of <br />Emergency Management and the TLC Water Project District and all parties agreed to explore multi-objective strategies <br />for hazard mitigation in the Basin. These strategies are called multi-objective because they address a wide range of com- <br />munity concerns and objectives such as natural hazards, economic sustainability, water quality, open space, wildlife habi- <br />tat, outdoor recreation, and cultural values. A planning workshop was proposed as a means of developing a plan for the <br />area in an intensive, effective, and time-efficient manner. <br />On January 13, 1994, the South Dakota Division of Emergency Management chaired a meeting attended by FEMA <br />Region VIII and the RTCA Program of the National Park Service at which representatives from declared Presidential <br />disaster areas in South Dakota were present to answer questions about the proposed workshop and to determine local <br />interest in receiving help with the development of a Multi-objective Hazard Mitigation Management (MOHMM) plan. <br />Strong interest in a plan for the Vermillion River Basin was expressed by representatives from throughout the Basin and <br />by US. Representative Tim Johnson's office. This area was selected as the planning workshop site and for the develop- <br />ment of a MOHMM plan. <br />Specific interests and/or concerns identified at the January 13 meeting that the plan should address for the Basin included: <br />. flood control (both flash and long-term flooding) <br />. erosion (sheet and fluvial) <br />. standing water for fishing and duck habitat <br />. debris deposition (primarily trees and sediment) <br />. identifiable stream channel in Lake County <br />. recreational opportunities <br />. consideration of long-term domestic water supply needs <br /> <br />. <br />