Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />t <br />I <br />I <br />I I <br />I <br />I <br />I <br />I <br />I <br />i <br />I <br />I <br />I <br /> <br />ChsptIN 2-Storm WatM Pollution Prevention Pfan <br /> <br />EPA BASELINE GENERAL PERMIT REQUIREMENTS <br /> <br />Storm Water Pollution Prevention Plan Development <br /> <br />Parts IV.A.1, 2, and 3. <br /> <br />Storm Water Pollution Prevention Plans should be fully developed and implemented upon <br />submitting the Notice of Intent (NOlI to be covered by the general permit. The operator should <br />comply with the terms and schedule of the plan beginning with the initiation of construction <br />activities or October 1, 1992, whichever is later.. This requirement applies to existing <br />construction sites on October 1, 1992, as welt as new sites which begin construction after this <br />date. <br /> <br />September 1992 <br /> <br />2-3 <br />