Laserfiche WebLink
<br />Chapter 2-Storm Water Pollution Prevention Plan <br /> <br /> SITE EVALUATION AND DESIGN DEVELOPMEN;T <br /> . CoUect site information <br /> . Develop site plan <br /> . Prepare pollution prevention site map <br />+ <br /> ASSESSMENT <br /> . Measure the site area <br /> . Determine the drainage areas <br /> . Calculate the runoff coefficient <br />t <br /> CONTROL SELECTION/PLAN DESIGN <br /> . Select erosion and sediment controls <br /> . Select other controls <br /> . Select storm water management controls <br /> . Indicate the location of controls on the site map <br /> . Prepare an inspection and maintenance plan <br /> . Coordinate controls with construction activity <br /> . Prepare sequence of major activities <br /> . Incorporate State or local requirements <br />. <br /> CERTIFICATION AND NOTlACATlON <br /> . Certify the plan <br /> . Submit Notice of Intent <br /> . Plan location and public access <br />+ <br />--" <br /> CONSTRUCTlONnMPLEMENTATlON <br /> . Implement controls i <br /> . Inspect and maintain controls <br /> . Update/change the plan <br /> . Report releases of reportable quantities <br />t <br /> ANAL STABIUZATlONlTERMINATlON <br /> . Final stabilization <br /> . Notice of Termination <br />FIGURE 2.1 DEVELOPING AND IMPLEMENTING A STORM WATER POLLUTION <br /> PREVENTION PLAN FOR CONSTRUCTION <br /> <br />2-2 <br /> <br />September 1992 <br /> <br />I <br />I <br /> <br />I <br />i <br />I <br />I <br />I <br /> <br />II <br />I <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br />