My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04928
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04928
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:11:55 AM
Creation date
10/5/2006 1:07:53 AM
Metadata
Fields
Template:
Floodplain Documents
County
Denver
Jefferson
Community
Denver, Edgewater, Lakewood, Wheatridge
Stream Name
Sloans Lake Basin
Basin
South Platte
Title
Major Drainageway Planning
Date
12/1/1977
Prepared For
Denver / Lakewood
Prepared By
UDFCD
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />STUDY <br /> <br />AREA <br /> <br />SECTION I <br />INTRODUCTION <br /> <br />The "Major Drainageway Planning Sloan's Lake Basin" Report, Phase A was <br /> <br />prepared for Urban Drainage and Flood Control District by URS Company <br /> <br />in March 1977. The Phase A report provides an overview of the drainage <br />and flood control problems and the general concepts of solutions to <br /> <br /> <br />the problems in the Sloan's Lake Basin. This prel iminary design, Phase B <br /> <br /> <br />report will further examine and provide a preliminary design for the <br /> <br /> <br />selected alternative in sufficient detail for planning and proceeding <br /> <br />with final design plans and specifications. <br /> <br />The decisions reached in Phase A are re-examined in light of final <br /> <br /> <br />hydrologic and hydraulic studies. A preliminary drainage and flood <br /> <br /> <br />control design for the selected alternative is then presented with plan <br /> <br /> <br />and profile drawings. Cost estimates including all maintenance aspects <br /> <br />are tabulated by reach and a recommended staged construction program is <br /> <br />included. The results of this preliminary design are summarized in the <br /> <br />letter of transmittal at the beginning of the report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.