My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04852
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04852
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:47:29 PM
Creation date
10/5/2006 1:05:40 AM
Metadata
Fields
Template:
Floodplain Documents
County
San Miguel
Community
Telluride
Stream Name
San Miguel River
Basin
San Juan/Dolores
Title
CLOMR - Affected Community 080168 - Case No. 96-08-190R
Date
6/30/1997
Prepared For
Telluride
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />} ~ ~'-..>3 ~'? <br /> <br />,I;!e,,,rose, CO 81401 <br />,=.!.j 9701 249-0945 <br /> <br /> <br />'~~~,()TEC~",.I: <br /> <br />Civil, Structural & Geotechnical Engineers <br /> <br />~ ~'1 3.::..:""' :;):';11""\ '\',-::- <br /> <br />May 22, 1996 <br /> <br />Michael Baker Jr., Inc. <br />3601 Eisenhower Avenue, Suite 600 <br />Alexandria, Virginia 22304 <br /> <br />ATTN: Ms. Colleen S. Spencer <br />Case No.: 96-08-190P <br />Community: Town of Telluride, Colorado <br />Community No.: 080168 <br /> <br />Dear Ms. Spencer: <br /> <br />Accompanying this letter are the requested forms and related supporting <br />documentation requested in the correspondence dated April 8, 1996, from Michael K. <br />Buckley, P.E. This information is provided to support the LOMR request dated January <br />8, 1996, and prepared by Buckhorn Geotech, Inc., on behalf of our client, Gondola House <br />Associates, L.L.C. Every effort has been made to supply the requested information in the <br />appropriate formats. <br /> <br />The following summary of submittals is made to aide in the review process: <br /> <br />1. Form I, pages 1-4 <br />2. Form 2 <br />3. Form 4, pages 1-6 <br />4. Form 5, pages 1-3 <br />5. Duplicate effective model multi profile and floodway runs, with printouts and <br />computer files <br />6. Existing conditions model multi-profile and floodway runs . with printouts and <br />computer files <br />7. Project condition model milti-profile and floodwayruns, with printouts and computer <br />files. <br />8. Work map <br />9. Floodway data table <br />10. FIS scaled profile <br />11. Annotated FIRM at modified scale <br /> <br />Two changes have taken place in the LMOR study reach of the San Miguel River <br />since the 1988 FIRM was published. The Icehouse projects have been completed as noted <br />on the work map. These buildings were placed in the floodplain overbank: of the river. <br />
The URL can be used to link to this page
Your browser does not support the video tag.