My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04776
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04776
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:47:13 PM
Creation date
10/5/2006 12:59:07 AM
Metadata
Fields
Template:
Floodplain Documents
County
Pitkin
Community
Aspen
Stream Name
Roaring Fork River, Hunter Creek
Basin
Colorado Mainstem
Title
Aspen Village GMP Submission
Date
5/30/1980
Prepared For
Pitkin County
Prepared By
Aspen Village
Floodplain - Doc Type
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />GMP EVALUATION CRITERIA <br /> <br />I. AVAILABILITY OF PUBLIC & PRIVATE FACILITIES <br /> <br />A. Water <br /> <br />The existing Aspen Village water system is the only central <br />system in the Highway 82 corridor between Snowmass and <br />Basalt. The applicant will spend up to $300,000 to improve <br />the water and-sewer systems, and the overall fire protection <br />facilities. The water expenditure will primarily upgrade <br />the water pumping and storage capacity of the system, as <br />recommended by an evaluation of the system by Eldorado <br />Engineering. With the connection of the new units, the <br />improved system will upgrade the water service for both the <br />trailer park users and new users. <br /> <br />The 1979 referral letters of the County Sanitarian and the <br />State Engineer (Appendix) stated the water system could be <br />upgraded to full compliance and that specific engineering <br />plans will be required at Detailed Submission. <br /> <br />The 3 southern riverfront homesites will be connected to <br />the central system. As described earlier, the technical; <br />easement, and cost feasibility of crossing the river and <br />connecting the 3 northern riverfront homesites is also being <br />examined. If the northern homesites should not be connected, <br />they will be serviced by individual or shared common wells. <br />The 1979 referral letters of the County Sanitarian and the <br />State Engineer stated specific engineering plans will be <br />required at Detailed Submission but that individual or <br />shared wells can be developed in compliance with Code. <br /> <br />B. Sewer <br /> <br />The existing Aspen Village sewer system is the only central <br />system in the Highway 82 corridor between Snowmass and <br />Basalt. The applicant will expend significant funds to <br />upgrade the system with the connection of the new units. <br />The 1979 referral letters of the County Sanitarian and the <br />State Engineer (Appendix) stated the system could be up- <br />graded to full compliance and that specific engineering <br />plans will be required at Detailed Submission. <br /> <br />The 6 riverfront homesites not connected to the central <br />system will be serviced by individual or common septic <br />systems. The applicant has not connected the riverfront <br />units to the central system because the units could not be <br />serviced by a gravity flow system dur to their lower ele- <br />vation. Based on previous conversations with the County <br />Sanitarian, if standard septic-leach field systems are not <br /> <br />- 10 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.