Laserfiche WebLink
<br />TABLE 1-1 - SHIEFIT/COST ANALYSIS D,;TA FOR ALTER~IMI"E PLAN COMPARISOt, <br />RECO~:ENDEO IMPRO"E~ENTS <br />McClELlANDS AND MAIL CREE~ <br /> <br />S~l!et 2 [) f 2 <br /> <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 " <br /> Reach/ Construction Costs Total Annual Total Annual Residual ~et Total <br /> Improvement Pond O~t1et--Uti1'~ Contingency ROW Canst. Canst. Annual lmprovef'lents Flood Annual Annual Annual BIC <br /> Description Construction '~orks Relocation 50% Acquisition Costs Costs 0& M Costs Darr,age Benefit Benefit Costs Ratic <br /> REACH 6 <br />A Existing 35,430 <br />Comtdnation 20,500 10,300 30,800 2,170 2,100 4,270 6,190 29,240 24,970 1?,460 6.85 <br />Improvemt. 3 <br /> Total Acres 1,117.2 Improvement Cost/Total ,\eres , $30,80011,117.2:$29.60 <br /> Total Undeveloped Acres 860.1 (approx) Improvement CostjTota1 Undeveloped Acres , $30,800/ 860.1 , $35.80 <br /> --~ <br /> <br />).6 <br /> <br />. <br />