Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Meetings time <br />The COllsaltant's time to meet witIJ. the Steeriag Committee aad C'NCB staff for this projeet totals <br />18 hoars for foar meetings. The COllsaltaJJ:t's Pr-e-jeet MaRager aFId Projeot Engineer will be <br />atteading these meetillgs. Consultant shall communicate with CWCB via telephone, email, fax, and <br />meetings as necessary for project coordination. <br /> <br />Proiect Coordination <br /> <br />CWCR Project Manager <br />The CWCB Project Manager, Mr. Tom Browning, will coordinate activities performed 'by the <br />Project Consultant. Any Project-related questions or problems should be directed to Tom at (303) <br />866-3441. The CWCB Project Manager will be available for meetings and for project coordination <br />with the Consultant. The Consultant will be responsible for providing the CWCB with an assigned <br />project manager and/or project engineer to serve as the point of contact for coordination with the <br />CWCB. <br /> <br />Overall Project Coordination <br />ConsaltaRt shall Be responsiBle for soheElaliag and advertising steering eo_ittee meetings. <br />Consledtant shaIl also set Hfl all meeting loeatioRs and eOllfereaoe rooms, preparilig semi formal <br />preseatatiolls to the oommittee, note taking daring meetillgs, preparing and dissemiliating meeting <br />miffilles. C'.vCB shall set Hfl a web page loeatioli on the DNR weboite to provide Ufl to date projeet <br />informatioR and stams reports. The web page will allow fer revie',ver f-ceGbaelc, storage of email <br />responses, and general proj eet informatioll. CWCB shall develop and operate the web page. <br /> <br />Deliverables <br />Consultant shall produce professional chapters for the Items identified in Table I for this contract <br />including text, charts, and figures. Specific deliverables are: <br /> <br />· 5 hard copies of draft work products (black and white) for review and approval by CWCB <br />· 5 hard copies of the final assigned chapters (in 3 ring binders w/high quality paper and use of <br />color) with place holders for all other chapters. <br />· Color report covers for final copies. <br />· 2 CD's with electronic files of the work products <br /> <br />The final report shall be prodaeed witfi high E{aality paper, maps, priating, aIld eopying. /\. <br />professioRal pr-eseatatien is required. The report cover and geaera! report l&yem shall be appreved <br />by the C'NCB. Speeifie deliverables are: <br /> <br />. 15 hare copies of eash dr-aft sestien of the mliIffial, as the shapters are eompleted, for review <br />by the CWCB and tlJ.e Steering Committee (Mask aad white is aceeptable-). Eleelfenie files <br />ef the iaformatien will also Reed ts be em&iled to &11 reviewiag parties/ageaoies. <br />. 25 hard eopies of the fiRa! manaal in :3 riag binders 'lIith printed COVel's. <br />. 25 eSHIflaet disks ooatainiag eleetreaie Files sf the filial m!lftual. <br />