My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04628
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04628
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:46:47 PM
Creation date
10/5/2006 12:47:46 AM
Metadata
Fields
Template:
Floodplain Documents
County
Bent
Community
Las Animas
Stream Name
Arkansas River
Basin
Arkansas
Title
Las Animas Flood Control Project Operation and Maintenance Manual
Date
2/1/1979
Prepared For
Las Animas
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />at such inte~ediate time as may be necessary to insure the best <br />possible care of the ditches. Immediate steps shall be taken to <br />correct dangerous conditions disclosed by such inspections. <br />Regular maintenance repair measures shall be accomplished during <br />the appropriate season as scheduled by the superintendent. <br /> <br />3-05. Effluent Discharge Line. Sewage from the city of Las <br />Animas is treated in four lagoons. Effluent is discharged from <br />the northeast lagoon into the river throught a 12-inch C.I. pipe <br />that crosses the south levee at Sta 392+00. The portion of the <br />pipe under the levee is concrete encased to preclude leakage. <br /> <br />a. Operation. During periods of high flow in the river, the <br />flap valve at the pipe end is closed and the effluent must be <br />diverted into a drain ditch. The diversion is accomplished by <br />means of a Y with a gate valve on each of its branches. When <br />high flows occur, the valve on the main line will be manually <br />closed and the one on the branch opened, diverting effluent into <br />the drain ditch. When the water recedes, the valve on the branch <br />will be closed and the one on the main line reopened. <br /> <br />b. Maintenance. It shall be the superintendent's responsi- <br />bility to inspect the effluent discharge line immediately fol- <br />lowing periods of high flow in the river and prior to and fol- <br />lowing the flood season to be certain that no leakage is occur- <br />ring and that the valve arrangement is functioning correctly. <br /> <br />III-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.