Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I, <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTIONFIVE <br /> <br />Funding Options <br /> <br />Initial <br />Coordination <br />Meeting <br /> <br />Scoping <br />Meeting(s) <br /> <br />Community <br />Outreach <br /> <br />Statewide <br />Needs <br />Assessment <br /> <br />Creation of <br />Statewide <br />Base Map and <br />Scoping and <br />Assessment <br />Tool <br /> <br />. Production of an initial coordination meeting map detailing U.S.G.S. DOQQ <br />boundaries, Q3 data, political boundaries, etc. <br /> <br />. Travel to the meeting <br /> <br />. Review of base mapping, etc. gathered from the initial coordination meeting <br />prior to the scoping meeting. <br /> <br />. Two scoping meetings, the first to discuss the scope and the second to <br />present the results from the first. <br /> <br />. Travel to the meetings <br /> <br />Perform outreach, including meetings and workshops, as well as email and other <br />methods of survey and data gathering. <br /> <br />Verify that the data used Verify that the data used to identify needs is <br />to identify needs is accurate using yearly surveys, and other methods <br />accurate using yearly and update the needs assessment database on a <br />surveys, site visits, and yearly basis. <br />other methods and <br />update the needs <br />assessment database on a <br />yearly basis. <br /> <br />Compile the digital data into a statewide base map database for use as a scoping <br />and assessment tool, and to facilitate flood hazard mapping activities in the <br />future. <br /> <br />Please note that the current level of funding that Colorado has received for Map <br />Modernization does not meet even the lowest of the three funding levels presented above. <br />In fact, the current level of funding is slightly less than half of the lowest level of funding. <br />Projecting the approximately $1,500,000 ofFY 03 total dollars (federal and non-federal) that the <br />Colorado has expended into a 5-year plan yields just under $9,000,000 (if credit is given for the <br />FY '03 funding as well as funding for the five years from FY ~04 through FY '08) for the <br />duration of Map Modernization. Figure 5.1 below depicts the projected funding based on FY 03 <br />studies, as well as the Low, Medium, and Full levels of funding listed in the table above. <br /> <br />5-2 <br /> <br />Colorado Business Case Plan - March 2004 <br />