Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />,I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTIONFOUR <br /> <br />Performance Goals <br /> <br />on high population urban counties early, addressing the needs of lower population rural counties <br />later. For FY 2006 and FY 2007 the total proposed annual budget is similar to the proposed <br />annual budget for FY 2004 and FY 2005. That is because estimated costs for many of the rural <br />counties are lower than estimated costs for urban counties, so more counties can be studied for <br />the same total budget. That is not true for FY 2008 because the total number of counties left to <br />map is so great. <br /> <br />It is important to note that despite all the work that has gone into cost estimates for updating the <br />counties maps, they are still preliminary estimates. No Initial Coordination Meetings or Scoping <br />Meetings have been performed, so cost estimates are somewhat general. The source data for the <br />cost estimates is based in large part on data provided by community staff without benefit of <br />initial coordination and scoping support from CWeB. <br /> <br />The CWCB recognizes and understands that considerable time and effort is required to perform <br />pre-scoping and scoping activities prior to finalizing cost estimates for each county. In the event <br />that a community has not reported or has underestimated the flood mapping needs within its <br />jurisdiction, the cost to actually update the FIRM maps in these areas will be higher than the <br />current estimates. <br /> <br />The CWCB is currently unable to estimate, with any certainty, the actual cost to perform <br />these studies until Initial Coordination Meetings and Scoping Meetings are conducted and <br />more accurate panel counts and stream miles are established. The estimates provided in this <br />report should be used for planning purposes only. These estimates will be revised as part of the <br />annual update of the Business Case Plan as studies are completed and as more information is <br />gathered on the potential scope of work for each of these county mapping efforts. <br /> <br />The current funding levels severely inhibit Colorado's ability to reach FEMA's performance <br />goals. To illustrate this point, at the rate of current FEMA funding (~$1 ,000,000 per year) the <br />CWCB would need to produce 11 countywide DFIRMs per year at a ridiculously low cost of <br />approximately $85,000 per county in order to achieve all of the performance metrics in Table <br />4.1. More information on the difficulty of achieving this performance goal is outlined in <br />Appendix F. <br /> <br />A summary listing of the counties and a description of the tasks that can be performed for the <br />three funding levels outlined above, as well as a year-by-year cost breakdown and projected Map <br />Modernization schedule, is included in Section Five. <br /> <br />Colorado Business Case Plan - March 2004 <br /> <br />4-7 <br />