Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTIONTHREE <br /> <br />Program Plan <br /> <br />· Yearly update of the individual prioritization parameters and of the Prioritization List <br /> <br />· Completing Statewide Needs Assessments and updating them annually <br /> <br />· Conducting initial coordination meetings in all potential candidate counties in a given <br />fiscal year <br /> <br />· Evaluating data from communities (i.e. digital topography, GIS, hydrologic and hydraulic <br />studies) for completeness and acceptability <br /> <br />. Conducting scoping meetings and completing Mapping Activity Statements <br /> <br />. Contracting flood study updates <br /> <br />. Resolving issues, disputes, and changes to scopes and contracts as needed <br /> <br />. Documenting resolutions to issues and new policy initiatives <br /> <br />. Monitoring engineering consultants performing flood study updates <br /> <br />. Invoicing and project tracking related to engineering consultants performing flood study <br />updates <br /> <br />. Generating summary and progress reports for FEMA and the public <br /> <br />. Conducting public outreach regarding Colorado's map modernization efforts, including <br />preparation and regular updating of all needed training materials <br /> <br />. Generating county-specific Mapping Activity Statements, as needed <br /> <br />. Maintaining the Arc-IMS website <br /> <br />. Maintaining the scoping tool(s) <br /> <br />. Coordinating the resolution of appeals and protests <br /> <br />. Coordinating progress meeting with communities and mapping partners <br /> <br />. Solicit and contract mapping contractors <br /> <br />The CWCB, through cooperative funding from FEMA and CWCB, previously conducted a pilot <br />study of the tasks involved in DFIRM production and the management tasks associated with <br />flood study production. The results of that investigation found that sufficient work exists to <br />support additional project management staff, identified as a "Mapping Coordinator" in the draft <br />report titled "Colorado's Map Modernization Program - Updating Colorado's Flood Maps". A <br />copy of this report can be requested and obtained from the CWCB. <br /> <br />A Mapping Coordinator has been identified as an important. component to the CWCB's <br />Floodplain Mapping Program, particularly to assist with many of the additional program <br />management responsibilities identified above, as well as some of the Information Technology <br />requirements mentioned in subsection 3.2.3 below. As such the Mapping Coordinator position <br />has been accounted for in the budget of this Plan, according to the aforementioned Full, Medium, <br />and Low funding levels. Additional information on the tasks and associated costs for the <br />Mapping Coordinator position are detailed in Section Five of this report, however the CWCB <br />requests funding for a Mapping Coordinator of $100,000 per year for each of the 5 years <br />represented in this Plan (2004-2008). <br /> <br />Colorado Business Case Plan - March 2004 <br /> <br />3-21 <br />