Laserfiche WebLink
<br />Jersey Barriers <br />Approx. Construction Time: 5 Hours <br /> <br />IMPORTANT NOTICE: Time and equipment needs can vary greatly with this <br />method. Factors to consider include travel distance, type of barrier used (i.e. <br />pin anchors vs. cable system) and type of placement equipment used at the <br />destination. The information presented below should be used only as a rough <br />guide. <br /> <br />Materials Per 1,000 Linear Feet: <br />200 . 10' Long Jersey Barriers <br />400 . Anchor Pins (if required) <br />200 . Connector Pins (if required) <br />2,010. ft. Connector Cable (if <br />required) <br />145. cu. yds. fill <br />1,000 L.F. 8 ft., 6 mil Poly <br />4,000 Sandbags <br />65 Tons Sand for Above (wet weight) <br /> <br />Personnel & Equipment: <br /> <br />Personnel: <br /> <br />1 Foreman (Sector Leader) <br />3 Team Leaders <br />30 WOrkers" <br /> <br />"Number is highly variable depending <br />on deployment system. <br /> <br />Tools and Equipment:"" <br /> <br />2 Transport/Placement Trucks <br />1 Front End Loader <br />2 Mechanical Tampers w/5 gal. <br />Fuel, Oil, Etc. <br />1 Drill/Pin Driver (if required) <br />1 Cable Puller (if required) <br /> <br />"" <br /> <br />depending on type of barrier and <br />deployment system. <br /> <br />E - 14 <br />