Laserfiche WebLink
<br />I <br />I <br />I .~ <br />I <br />I <br />I <br />J~rsey Barrier Flood Works <br /> <br /> <br />'- <br /> <br />Construction: <br /> <br />1. Place First Row of Barriers on S und Footing <br />2. Attach Barriers Together with C ble <br />3. Anchor Barriers with Pins to Gr und <br />4. Position Second Row of Barrier on Sound Footing <br />5. Attach Second Row of Barriers ogether with Cable <br />6. Anchor Second Row of Barriers ith Pins to Ground <br />7. Fill and Tamp Space Between rriers with Earthfill <br />8. Place Poly on Water Side and A chor with Sandbags <br />9. Drape Poly Over Barriers <br /> <br />Poly Sheeting <br /> <br />tI1 <br /> <br />CI yfill <br /> <br />- <br />w <br /> <br />Anchor pins, if so provided <br /> <br /> <br />To Water <br /> <br />. <br /> <br />Anchor cable, if so provided <br /> <br /> <br />Sand bags placed. <br />on poly at toe <br />