Laserfiche WebLink
<br /> <br />(1.22) <br />831-036.08C <br />cjb <br /> <br />. <br /> <br />. <br /> <br />-6- <br /> <br />1) As built surveys and detailed mapping of the upper <br />drop structure. Surveying and mapping of the lower <br />drop structure was done as a part of Wright Water <br />Engineers study for the Brown Ditch boatchutes and <br />will be ut1lized on this project. <br /> <br />2) Engineering design and drawings showing proposed <br />modifications to the structu res for inclusion in the <br />Union Avenue Dam construction contract. <br /> <br />3) Resident Engineering and inspection of construction <br />work related to this work item including working <br />with the contractor on detailed rock placement for <br />improved boatability and safety. <br /> <br />b. Cost for this work item will be $10,000 <br />