My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04418
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04418
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:46:10 PM
Creation date
10/5/2006 12:38:40 AM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Stream Name
South Platte
Basin
South Platte
Title
Union Avenue Boat Drop - Project Proposals, Contract Info & Billing Invoices - Part 1
Date
1/1/1983
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />'. <br /> <br />. <br /> <br />. <br /> <br />-5- <br /> <br />2) Observation of the flow tests conducted on the <br />hydraulic model and consultation on required <br />modifications as necessitated by those tests. <br /> <br />3) Observation and acceptance of the test procedures. <br /> <br />4) Revlew of the reports and documentation prepared by <br />the USBR. <br /> <br />b. Estimated cost is $9,000 <br /> <br />2. Resident Engineering !Inspection <br /> <br />a. <br /> <br />Fulltime construction inspection and field engineering <br />to assure the correct placement of materials and <br />adequacy of construction performance. <br />Work items to include: <br /> <br />1) Construction staking <br /> <br />2) Inspection of work for quality and adherence to <br />specifications <br /> <br />3) Inspection of material and equipment <br /> <br />4) Inspection of existing utilities and structures <br /> <br />5) Daily reports on men, equipment, and work performed <br /> <br />6) Measurement of quantities <br /> <br />7) Project photos and records <br /> <br />8) Insurance of proper rock placement <br /> <br />b. <br /> <br />Estimated cost is $28,000 for a 60 working day <br />construction period as indicated on the work schedule. <br />Costs will be $400!day for additional time required <br />beyond that schedule. <br /> <br />3. Modifications of the Oxford Avenue Boatchutes <br /> <br />a. This phase includes all work necessary for engineered <br />improvements to both upper and lower boatchutes located <br />near Oxford A venue for improved boating safety. <br />Specific work items include: <br /> <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />i <br /> <br />i <br />i <br />! <br />I <br /> <br />-.-----" <br />
The URL can be used to link to this page
Your browser does not support the video tag.