Laserfiche WebLink
<br />.' <br /> <br />. <br /> <br />. <br /> <br />-3-. <br /> <br />2. Consultation with and advice to the CWCB as to the <br />acceptability of contractors, subcontractors and other <br />persons and organizations proposed by the contractors. <br /> <br />3. Consultation with and advice to the CWCB as to the <br />acceptability of substitute materials and equipment proposed <br />by the contractors when substitution prior to the award of <br />contracts is allowed by the bidding documents. <br /> <br />4. Consultation <br />construction. <br />con tractor. <br /> <br />with and advice to the CWCB during <br />Also act as liaison between the CWCB and the <br /> <br />5. Preparation of elementary and supplementary sketches <br />required to resolve problems due to actual field conditions <br />encountered. <br /> <br />6. Review and approval for conformance with design concept of <br />detailed construction drawings and shop and erection <br />drawings submitted by the contractor for compliance with <br />design drawings and specifications. <br /> <br />7. Review and approval for conformance with design concept of <br />laboratory, shop, and mill test reports on materials and <br />equipment. <br /> <br />B. Field Administration Services <br /> <br />1. Visitations to the project site to observe the progress <br />compliance with drawings and specifications, and the quality <br />of the executed work, and then informing the CWCB. <br /> <br />2. Issuing instructions from the CWCB to the contractor, <br />issuing necessary interpretations and clarifications of <br />contract documents, preparing required change orders, <br />requesting special inspections and testing of the work. <br />including concrete tests, rip rap weight and gradation, and <br />sieve analysis of bedding material, and making decisions as <br />to acceptability of the work. <br /> <br />3. Determining amounts of progress payments due, based on <br />completion of the work, and recommending issuance of such <br />payments by the CWCB. <br /> <br />4. Observing initial operation of the project, or of <br />performance tests required by the specifications. <br />