Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />overtop the roadway. Signficant detention volumes exist relative to <br />the total storm runoff volume. Additional hydraulic analysis was <br />perfOlmed for these cases to detlne the floodplain. <br /> <br />Shay Ditch at 1-25 <br />At this crossing the [-25 embankment creates an inadverdent storage <br />volume of more than 150 acre-feet (AF) before overtopping 1-25. This <br />storage volume is greater than the total 100-year runoff volume of 126 <br />AF; thus, the entire 100-year runoff could be stored upstream of the <br />embankment without overtopping 1-25 or creating transbasin flow. Be- <br />cause of these conditions, the decision was made that the inadverdent <br />detention storage would be considered in delineation of the floodplain. <br /> <br />C. HYDRAULICALLY DISCONNECTED FLOW <br />A flow split occurs when a portion of the flood flow completely sepa- <br />rates from the main channel due to inadequate drainage facilities. [f <br />the tlow: (I) does not return to the main channel, (2) is a signitlcant <br />portion of the tlood peaks, and/or (3) is a potential flood hazard, <br />then the condition requires an independent analysis. <br /> <br />The SWMM input model was moditled to reflect the existing detention <br />storage by adding the reservoir routing data. The maximum water sur- <br />face elevation in the detention facility was computed for the various <br />frequency storms. The tloodway limits were delineated based on the <br />storage required to store the 100-year runoff with a I-foot rise in the <br />100-year water surface elevation. Downstream of the crossing, the peak <br />flows used to detelmine the corresponding water surface elevations <br />assumed that no storage exists at the interstate crossing. <br /> <br />At all major and minor street crossings and the UPRR. the eXlstmg cul- <br />verts are inadequate to pass the full 100-year flow under future devel- <br />opment conditions; thus, the streets and railroad will be overtopped. <br />At many of these crossings, the road profile and the surrounding topo- <br />graphy are such that a pOltion of the 100-year runoff will overtop the <br />roadway and flow into the main channel downstream while another portion <br />of the flow will split from the main tlow and create a tloc;>dplain sepa- <br />rate from the main channel floodplain. For example, the Holly Street <br />crossing of Morris Creek and the Washington Street crossing of Shay <br />Ditch create areas of hydraulically disconnected flow. <br /> <br />South Fork Preble Creek at [-25 <br />A similar situation occurs at the [-25 crossing of South Fork Preble <br />Creek. The storage volume upstream of the crossing, however, will not <br />contain the entire 100-year runoff volume without split flow occurring. <br />Approximately 60 AF of storage is available upstream of the crossing <br />compared to 72 AF of runoff volume during the 100-year storm. Because <br />of the storage available relative to the total lllnoff volume and the <br />split flow situation, the same philosophy as described above was fol- <br />lowed. The SWMM model was moditled to reflect the storage at the <br />crossing and to determine the corresponding water surface elevations <br />for the various frequency storms. The floodway limits were delineated <br />based on the storage volume required to obtain a I-foot rise in the <br />100-year water surface elevation. <br /> <br />In all cases, the water sUlface elevations In the downstream channel <br />were based on tlows that assume no hydraulically disconnected tlow. <br />The f100dway limits at these locations assume that improvements are <br />made that would contain the full flow in the main channel. The flood- <br />plains created by the split tlow conditions were delineated and are <br />shown as hydraulically disconnected flow. <br /> <br />D. FLOODWAY <br />The f100dway is the main channel of a stream. plus those adjacent <br />tloodplain areas that must be kept free of obstructions in order that <br />the 100-year runoff be carried without signitlcantly increasing the <br />water surface elevation. Based upon UD&FCD cliteria, the f100dway was <br />detlned as being the limit of encroachment into the floodplain where <br />the existing energy grade line profile IS not increased more than <br />0.5-fee!. The HEC-2 computer program was utilized to determine the <br />f100dway limits. <br /> <br />IV-3 <br /> <br />IV-4 <br />