Laserfiche WebLink
<br />IV-3 <br /> <br />REACH COMMENTARY <br /> <br />Sheets 5, 6, and 7 of 23 <br />Station 2074+00 to 1738+00 <br /> <br />COST ESTIMATE <br /> <br />~: Columbine Valley to Oxford Avenue <br /> <br />Reach Two -- Columbine to Oxford <br />Flood Control Alternative: U.S. Army Corps of Engineers Channel <br />Improvement Project <br />Recreation Alternative: Linear Park. <br /> <br /> Unit <br /> .!!!! Quantity Cost ~ <br />A. Parks <br /> 1. Watson lake 17.2 AC $ 30,000 1516,000.00 <br /> 2. Focal Pt. Riverfront 1 AC 60,000 60,000.00 <br /> Development <br /> 3. Focal Pt. R1nf"ftalk 1 AC 60.000 60,000.00 <br /> Development <br /> a. Pocket Park (Waterfall) <br /> at Confluence of Lee Gulch a AC aO,OOO 160.000.00 <br /> 5. land Acquisition: <br /> .. lee Gulch Park a AC 35,000 140,000.00 <br /> b. Watson lake 17.2 AC 35,000 602,000.00 <br /> Subtota t : $1.538.000.00 <br /> <br />After the Corps completes its work, any remalnlng obstructions to <br />continuous boating should be fitted with boat chutes and landings. The <br />acquatic environment of the river can also be improved with selective rock <br />placement as needed. <br /> <br />8. Tra11s <br /> 1. Hard Surface Tra11 4.9 HI 125,000 612,500.00 <br /> Construction (trail only, <br /> grading by others) <br /> 2. Tributary Trans nIl <br /> 3. Pedestrian Bridge <br /> a) Unchannelized type 2 250,000 500,000.00 <br /> b) Drainage Crossing Type 3 50.000 150,000.00 <br /> Subtota 1 : $1.262.500.00 <br />C. Boat 1 ng <br /> 1. Large Boat Chutes 2 250,000 500,000.00 <br /> 2. Boat landt ngs 10 6.000 60.000.00 <br /> Subtotal: $560,000.00 <br />o. Fishing <br /> 1. Ff sh habitat 160 CY 50 8.000.00 <br /> (20 CV per spot) <br /> 2. Watson lake (State) nIl <br /> Subtota 1 : $8,000.00 <br />E. Access Poi nh <br /> 1. Rest Areas and 4 10.000 40.000.00 <br /> Special Features <br /> 2. Rher Plaza at Theatre LS 50.000 50,000.00 <br /> COlIplex <br /> Subtota 1 : $90,000.00 <br />F. Views/Landscaping <br /> 1. Linear Planting/Thinning a,9 HI 21.000 102,900.00 <br /> Subtotal: $102.900.00 <br />6. Wlldltr. <br /> 1. Landscape Plantings 4.9 MI 13,000 63,700.00 <br /> Subtota 1 : $63.700.00 <br /> Total: $3,625,100.00 <br /> 301 Contingency: 1,087,530.00 <br /> TOTAl REACH 2: $a,712.630.oo <br />!!!E!..!: Annu.l 0 , M Cost <br />Routine Mainten.nce <br /> 1. Tr.il Mowing 25,872 IF .36 9,314.00 <br /> 2. Weed Control 25,872 LF ,09 2,328.00 <br /> 3. Debris' Trash ReMOval 25,872 LF .50 12,936.00 <br /> a. Trlil Sweeping 25,872 LF .58 15,006.00 <br /> 5. Plrk Mowing 23.2 AC 480.00 11,136.00 <br /> $50,720.00 <br /> <br />Several pocket parks are recommended in this section, including Watson <br />Lake, and at focal points such as Lee Gulch, the Riverfront Development and <br />the Riverwalk Development. The entire reach is planned to be developed as <br />a linear park with a continuous trail running on the river's east side <br />until crossing via a new pedestrian bridge near Bowles to the west side. <br />Tributary trail connections are suggested along Lee Gulch and Big Dry <br />Creek. <br /> <br />The Corps of Engineers is currently channelizing this section of the river, <br />and existing vegetation is being stripped. In order to provide for a <br />conti nuous ri pari an wi 1 dl i fe corri dor with an aesthet i c character, <br />attent ion shoul d be given to revegetati ng both ri verbanks wi th i ndi genous <br />species at the earliest possible opportunity. In focal point parks which <br />are natural in character, opportunities may exist for developing additional <br />wetland areas as native wildlife habitats. <br />