My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04360
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04360
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:46:01 PM
Creation date
10/5/2006 12:34:13 AM
Metadata
Fields
Template:
Floodplain Documents
County
Bent
Community
Las Animas
Stream Name
Arkansas River
Basin
Arkansas
Title
Interim Report on Review Survey for Flood Control
Date
8/1/1963
Prepared For
Las Animas
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br /> <br />~ <br /> <br />Sport Fisheries and Wi Idl ife, U.S. Fish and Wi Idl ife Servicl;l. According <br />to, this agency, the proposed'depth and bottom' width would be adequate <br />to provide sufficient oxygen to sustain fish I ita during tn.. winter" <br />~ , " ' ,. I <br />when tne surface is frozen. ,The c'lty of Las An i mas' apprOVali' the des i gn <br />of thela'ke and agr'eed to ma i nta i n a permc;lnen-t poo' by' means' or 'an , <br />inlet canal approximately 1,250 feet long leading from an irrigation <br />ditch from wh ich the city has a water ri'g'ht. ' <br />i 1, <br /> <br />TABLE 7. - I nvestment and Annual Charges- La,s An imas <br />Loea,1 Protection Project (January 1963,Price levels:),,' <br /> <br />Item <br /> <br />C05>t, <br /> <br />Inves-tment: <br /> <br />Federa I: <br />Federa I f i.rst cost* <br />Interest during constructiont <br /> <br />$1,541,000 <br /> <br />Tota I, Federa I I nves-tmen-t <br /> <br />1',541,000 <br /> <br />Noo-federa I : <br />Non-Federa I first cost, <br />Interest dur i ng construct i ant <br /> <br />184,000' <br /> <br />, --- <br /> <br />Total Non-Federal Investment <br /> <br />18.4,,000 <br /> <br />TOTAL INVESTMENT <br /> <br />$1.,725,000 <br /> <br />Annual charqes: <br /> <br />Federa'l: <br />,1 nterest and amort i zat i on <br /> <br />48,770 <br /> <br />Total Federal Annual Charges <br /> <br />48,770 <br /> <br />Non-Federa I : <br />Interest and amortization <br />Operat ion, ma i ntenance, and <br />r,ep lacement <br /> <br />5..,820 <br />4,,410 <br /> <br />Total Non-Federal Annual Charges <br /> <br />10,230. <br /> <br />TOTAL ANNUAL CHARGES' <br /> <br />$59,000 <br /> <br />*Does not include preauthorization study cost <br />, <Of ' $54,000. <br />tConstruct i on per i od less than 2 years. <br /> <br />d. <br /> <br />33 <br /> <br />R 1/28/64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.