My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04360
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04360
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:46:01 PM
Creation date
10/5/2006 12:34:13 AM
Metadata
Fields
Template:
Floodplain Documents
County
Bent
Community
Las Animas
Stream Name
Arkansas River
Basin
Arkansas
Title
Interim Report on Review Survey for Flood Control
Date
8/1/1963
Prepared For
Las Animas
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />~, <br /> <br />In 1952, pursuant to Section 14 of the 1946 Flood Control Act, emer- <br />gency bank protection was provided for valuable farmland and a county <br />road which were being destroyed by meandering of the river north of <br />the town. The work consisted of the excavation of a pi lot channel about <br />6,000 feet long across an oxbow and the construction of a diversion dike <br />at the upstream end to divert flows into the river channel. The Fed- <br />eral cost amounted to $25,600. In 1956, the pi lot channel was extended <br />about 9,300 feet upstream at an additional Federal cost of $35,800. <br />This work was authorized in accordance with Section 15 of the 1946 <br />Flood Control Act. The city of Las Animas later extended the pi lot <br />channel downstream for a distance of about 10,500 feet to the AT&SF <br />Ra i I way br i dge . <br /> <br />29. The only other Federal agency that has constructed water <br />resources improvements in the Arkansas River Basin in Colorado is the <br />Soi I Conservation Service. This agency, in addition to the regular <br />land treatment program carried on through organized Soi I Conservation <br />Districts, has constructed or contemplates construction of a number of <br />floodwater retarding structures under the watershed program authorized <br />by the Watershed Protection and Flood Prevention Act (Publ ic Law 566, <br />as amended). In the upper watershed of Big Sandy Creek above Limon, <br />13 structures have been completed and one is under construction. One <br />structure, designated by the Soi I Conservation Service as FPCA No.2, <br />has been completed and another (FPCA No. I) is being bui It in the Fishers <br />Peak-Garbon Arroyos watershed near Trinidad. Part of the city is <br />included in the project area and wi II benefit by the protection afforded. <br />Four structures are planned in the Vine land area about 10 mi les east of <br />Pueblo. A watershed Work Plan for three retardation dams has been <br />approved for Limon Creek, a tributary to the Big Sandy. A plan for <br />floodwater retarding structures and channels on Cheyenne Creek, near <br />the Colo.-Kans. State I ine, is being prepared. <br /> <br />30. There are more than 200 smal I reservoirs constructed by local <br />interests in the Arkansas River Basin in Colorado. These reservoirs <br />are primari Iy for irrigation storage but they also provide local flood <br />control and domestic and industrial water supply. The largest of these <br />is the Great Plains Reservoirs system, a series of off-channel reser- <br />voirs located northeast of John Martin Dam. This system has an aggre- <br />gate capacity of 100,000 acre-feet. Others are Adobe Creek Reservoir <br />on Adobe Creek with a capacity of 62,000 acre-feet; Cucharas and Two <br />Buttes Reservoirs on Cucharas River and Two Butte Creek, each with a <br />capacity of 40,000 acre-feet, and Horse Creek Reservoir on Horse Creek. <br /> <br /> <br />31. The only major flood control improvements constructed by <br />local interests in the Arkansas Basin are the Barrier Dam and Pueblo <br />Floodway. These improvements were bui It on the Arkansas River in <br />1924-25 by the Pueblo Conservancy District which was organized soon <br />after the disastrous flood of 1921 for the purpose of providing flood <br />protection to the city of Pueblo. The floodway is a concrete trape- <br />zoidal channel approximately 10,000 feet long extending through the <br /> <br />II <br />
The URL can be used to link to this page
Your browser does not support the video tag.