My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04325
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:45:55 PM
Creation date
10/5/2006 12:33:04 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Basin
Statewide
Title
Rules and Regulations for Dam Safety and Dam Construction
Date
9/30/1988
Prepared For
State of Colorado
Prepared By
State of Colorado DNR
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Rule g. Construction Oua1itv Control (Jurisdictional Dams): <br /> <br />9.A. For Large, Intermediate, and Small, dams rated Class I. the <br />owner shall provide an engineer experienced in dam design and con. <br />struction, who shall be responsible for the following: <br /> <br />9.A.(I) Not less than 30 days prior to construction, the <br />engineer must submit to the State En9ineer a general plan for con. <br />struction observation. The construction observation plan shall <br />include: <br /> <br />9.A.(I)(a) The date of the start of construction; <br /> <br />9.A.(I)(b) Names and qualifications of the engineer and <br />staff to be used on the project; <br /> <br />9.A.(I)(c) A construction observation schedule for the <br />engineer and its staff; <br /> <br />9.A.(l)(d) For dams on rock foundations, a schedule for <br />of the foundation by a geologist, Dr engineering <br /> <br />observations <br />geologist; <br /> <br />9.A.(I)(e) A schedule for inspection of the gate <br />installation by the gate manufacturer or its representative unless <br />waived by the State Engineer; <br /> <br />9.A.(1)(f) Identification of the firm that will conduct <br />the construction material tests in the field; and <br /> <br />9.A.(I)(g) A schedule of the construction material <br /> <br />tests. <br /> <br />9.A.(2) Within ten working days of receipt, the State <br />Engineer shall provide his written co...ents and approval,or con- <br />ditions for approval of the construction observation plan. Con. <br />struction shall not commence without said approval. <br /> <br />9.A. (3) Subsequent to submitt ing the construction <br />observation plan, but no later. than one week prior to commencement of <br />construction. a meeting shall be held between the engineer, State <br />Engineer and the contractor. The contractor shall develop and <br />thoroughly explain their construction control plan along with any <br />anticipated construction difficulties. During this meeting, the means <br />used to divert and care for the stream during construction will be <br />identified by the contractor; and if reasonable, the plan will be <br />approved by the State Engineer. The name of the contractors and any <br />principals in charge shall be furnished to the State Engineer at the <br />meeting. <br /> <br />. 31 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.