My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04325
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:45:55 PM
Creation date
10/5/2006 12:33:04 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Basin
Statewide
Title
Rules and Regulations for Dam Safety and Dam Construction
Date
9/30/1988
Prepared For
State of Colorado
Prepared By
State of Colorado DNR
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />tile 'i.\a\t . <br /> <br />~~~~~\qecl by ~\ Qr <br /> <br /> <br />,<>.~.\'l.'\\~'\ \. t~\\\\\ "~\~~\'~~\\ \ ~~ \\ ~\\\ .. <br /> <br />~\\q\\\"'l' \\\~\\ '" \~'1lI\\\\I~~, \tt~\f.. ,l.~,l.. ~~~\'t"~ \\ <br />~'\"'l'1l.\\ail ~I\q \\\e \W'l'a\lT\\\\ \\I\t"\t\\\I'l"''', ""t\\ '\\"- ~\~~~~ ~) <br /> <br />an engineer. Ihe provhlons 0' Ru'es S.,I,.IOI, S.,I,.(Io1 (cost estimate <br />and fees) and Rule II.B. (nonjurisdlctlonal dalls) shall apply. <br /> <br />6.A. (2)(b) Ihe plans - and specifications shall contain <br />sufficient detail to enable a contractor to bid on, and construct the <br />repair, or alter the dall. The prOVisions of Rule 9 (construction <br />quality control), except for the time lillits of Rules 9.A.(I), <br />9.B.(I), and 9.C.(I), andRu1e 10 (acceptance of construction) shall <br />apply. The engineer shall give as much notice of the start of con, <br />struction as possible; and <br /> <br />6.A.(2)(c) Upon completion of a repair, the engineer shall <br />file AS-CONSTRUCTED plans that are in confonaance with Rules S.A.(2) <br />and 5.A.(3). (See Rule 11.B.) <br /> <br />. 6.A.(2)(d) AS-CONSTRUCTED plans are not required for altera- <br />tions to nonjurisdictional size. <br /> <br />6.A.(3) Plans for the repair of a small or lIinor size Class 111 <br />dam, or any Class IV dam; and plans for the alteration of any Class <br />III or' Class IV dam to nonjurisdictional size are exempt froll the <br />provisions of Rules SA., 6, g AND 10 except as specified in Rule <br />6.A. (3)(a). <br /> <br />6.A.(3)(a) The dam owner must prOVide at least thirty days <br />advanced written notice to the State Engineer. The written notice <br />.ust contain the name of the dam, the location of the dam, the name of <br />the owner, and a clear description of the work to be performed. If <br />the State Engineer determines that plans and specifications prepared <br />by an engineer are necessary for the repair, the owner will be <br />notified within five working days of the receipt of the notice. The <br />owner cannot begin construction until the plans and specifications are <br />approved by the State Engineer. If plans and specifications are not <br />required, the State Engineer will inform the dall owner of engineering <br />and construction requirements, if any, and will perform constructton <br />inspections as he deems necessary. The dam owner must keep the State <br />Eogineer informed of the project status, and provide the State <br />Engineer with 'AS-CONSTRUCTED" drawings and specifications within <br />sixty days following completion of the work. . The 'AS-CONSTRUCTED' <br />drawings lIustbe drawn on good quality paper with permanent Ink (or <br />equivalent), such that the drawings are reproducible, and suitable as <br />a long lasting permanent record <br /> <br />. 27 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.