My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04311
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:45:53 PM
Creation date
10/5/2006 12:32:22 AM
Metadata
Fields
Template:
Floodplain Documents
County
Pueblo
Community
Pueblo
Stream Name
Fountain Creek
Basin
Arkansas
Title
Pueblo Fountain Creek Flood Control Community File
Date
1/1/2001
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. . <br />~ ~ g1l Q <br /> <br />City of Pueblo <br /> <br />February 9, <br /> <br />1982liFl&~ <br />~ll( f:t2 1 'lJ?f?pJi::;. <br />c (.'0. 1;0 ~<f. <br />L11h ~OJ:J vB;:> <br />,,-:-~'qD ' <br />......ryi/ 0 <br />-.1-" "i" <br />. I/fl. yv", 1; <br />-,), Q ~-9 <br />'-'()A <br />- "t>t) <br /> <br />The Honorable William L. Armstrong <br />United States Senator <br />254 Russell Senate Office Bldg. <br />washington, D.C. 20510 <br /> <br />Dear Senator Armstrong: <br /> <br />As you may be aware, Phase 1 planning for the proposed Fountain <br />Creek Flood Control Project has been completed by the Corps of Engineers. <br />The Chief of Engineers has recently forwarded his report to the Secretary <br />of the Army recommending that the project be authorized for construction <br />(copy enclosed). <br /> <br />Since the project is not yet authorized, I do not expect the <br />President's FY 83 budget request to contain funding for it. This will <br />be most unfortunate, since the corps is in a position to proceed with <br />Phase 2 engineering and design work if funds are appropriated for that <br />purpose. <br /> <br />As local project sponsor, The Fountain Creek Commission feels strongly <br />, that some method should be found to enable the corps to proceed with Phase <br />2 engineering on this project even though authorization for construction <br />is probably some time in the future. Thus, we need your advice and assist- <br />ance as to how funds can be made available for this work in the FY 83 <br />budget. <br /> <br />This project enjoys broad public support from all sectors of the <br />community and local funds in excess of $1,669,000 through 1980 have already <br />been spent on land acquisition, relocations, preliminary levies and re- <br />creational facilities. With this significant dollars and cents expression <br />of local support, it seems unfortunate that the project cannot proceed. <br /> <br />I <br />~ <br />c <br /> <br />. <br /> <br />. <br /> <br />Any assistance that you can provide us would be greatly appreciated. <br /> <br />o <br /> <br />Sincerely, <br /> <br />/~~ <br /> <br />D. :::;.~~-{. Chairman <br />Fountain Creek Commission <br />Task Force on Flood Control <br /> <br />"Dul nw <br />cc: J. William McDonald, Director <br />Colorado water Conservation Board <br /> <br />P.O. Box 1427 Pueblo. Colorado 81002 (303) 5450061 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.