My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04311
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:45:53 PM
Creation date
10/5/2006 12:32:22 AM
Metadata
Fields
Template:
Floodplain Documents
County
Pueblo
Community
Pueblo
Stream Name
Fountain Creek
Basin
Arkansas
Title
Pueblo Fountain Creek Flood Control Community File
Date
1/1/2001
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />r <br />, <br />. <br /> <br />~::">-~-r.- "- '-'~~" <br />t. <br /> <br />~ ;' <br />};:." <br />;l~ <br />,:;:' <br /> <br />PROPOSED REPLY ~OR GOVERNOR LAMM'S SIGNATURE <br /> <br />June 23, 1981 <br /> <br />Colonel Forrest' T. Gay III <br />Executive Director, Engineer Staff <br />DAEN-CWP-A <br />Pulaski Bldg., Rm. 7103 <br />Washington, DC 20314 <br /> <br />~ <br /> <br />;;.> <br />~,L <br />flil:. <br /> <br />Dear Colonel Ga:r: <br /> <br />-> <br /> <br />We welcome the opportunity to review the proposed Fountain <br /> <br />I <br />Ii <br />I <br />m., <br />'j.~ <br /> <br />Creek, pueblo, ~olorado, flood control plans and project report <br /> <br />before final cO,:lgressional action. By prior communications with <br /> <br />the District En~ineer, Albuquerque District, the State of Colorado <br /> <br /> <br />has been monitoring and providing input into the project formula- <br /> <br />tion process. <br /> <br />The proposed plan as outlined in Volumes I and II of the <br /> <br />'h' <br />'.If' <br />, <br /> <br />report entitled "phase I, General Design Memorandum, Fountain <br /> <br />f <br />\ <br />~ <br />I <br />~, <br />,": <br /> <br />Creek," dated March 1981, has been reviewed by the Colorado Water <br /> <br />Conservation Board. The staff's specific comments will be mailed <br /> <br />directly to you. Based on the reviews performed by the Board, I <br /> <br />am advised that the proposed project design, which has an exceed- <br /> <br />l <br />I. <br />~ ' <br />fl <br />~ <br />\~.' <br /> <br />ence frequency of once in 200 years, does meet State standards. <br />empnas:Ze <br />I cannot overs~~eB8 the need for this project to the community <br /> <br />of Pueblo and its citizenry. Many of the existing residential <br /> <br />and business structures are subject to inundation from a 100-year <br /> <br />flood to depths of 10 feet. During the June 1965 flood, many <br /> <br />residents were forced from their homes due to flood waters from <br /> <br />Fountain Creek. Fountain Creek does have a history of flooding. <br />
The URL can be used to link to this page
Your browser does not support the video tag.