Laserfiche WebLink
<br />when the grade of the ground itself has been elevated <br />compacted fill above the elevation of the base floon. <br />requirements shall be that: <br /> <br />by <br />Special <br /> <br />(1) Over the top ties be provided at each of the four <br />corners of the mobile home, with two additional ties per side <br />at intermediate locations: with mobile homes less than 50 <br />feet long requiring one additional tie per side. <br /> <br />(2) Frame ties be provided at each corner of the home <br />with 5 additional ties per side at intermediate points; with <br />mobile homes less than 50 feet long requiring 4 additional <br />ties per side. <br /> <br />(3) All components of the anchoring system be capable <br />of carrying a force of 4,ROO pounds. <br /> <br />(4) Any additions to the mobile home be similarly <br />anchored. <br /> <br />. <br /> <br />(5) In lieu of the special requirements of paragraphs <br />(C)(1)(2) and (3) an alternative anchoring system may be used <br />if a licensed professional engineer certifies or technical <br />evaluation demonstrates that such system will adequately <br />anchor the mobile home with respect to a base flood <br />discharge. <br /> <br />(D) All new construction and substantial improvements shall <br />be constructued with materials and utility equipment resistant to <br />flood damage. <br /> <br />(E) All new construction and substantial improvements shall <br />be constructed uSing methods and practices that minimize flood <br />damage. <br /> <br />7 <br /> <br /> <br />(F) <br />designed <br />into the <br /> <br />All new and <br />to minimize <br />system. <br /> <br />replacement water supply systems shall be <br />or eliminate infiltration of flood waters <br /> <br />(G) <br />designed <br />into the <br /> <br />New and replacement sanitary sewage systems shall be <br />to minimize or eliminate infiltration of flood waters <br />system and discharge from the systems into flood waters. <br /> <br />(H) On-site waste disposal systems shall be located to avoid <br />impairment to them or contamination from them during flooding. <br /> <br />(I) All subdivision proposals shall be consistent with the <br />need to minimize flood damage, and shall have public utilities <br />and facilities such as sewer, gas, electrical and water systems <br />located and constructed to minimize flood damage. <br /> <br />. <br /> <br />(J) All subdivision proposals shall have adequate drainage <br />provided to reduce exposure to flood damage. <br /> <br />LC2/13 <br />