My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04286
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:45:49 PM
Creation date
10/5/2006 12:31:07 AM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
23
County
Adams
Community
Westminster
Stream Name
Big Dry Creek
Basin
South Platte
Title
Major Drainageway Planning - Master Plan - Big Dry Creek - Westminster - Volume I
Date
3/1/1973
Designation Date
7/1/1973
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1-2 <br /> <br />were allowed to make decisions on an alternative to be dealt with in detail <br />In the second phase. Phase B then became the datai led master planning and <br />report preparation phase of the contract. <br /> <br />An out line of the Scope of Work I '; as fo liONS: <br /> <br />A. Development of alternative plans. <br /> <br />I. Meet wi th I oca I governmenta lent i ty ,'eprllsentat i ves on future <br />land planning, collect basic dilta, and maintain contact with the <br />United States Corps of Engineers. <br /> <br />2. Perform hydrological studies for 5, 25, and IOO-year recurrence <br />intervals, and prepare flood hydrographs. Also estimate annual <br />flood damages and perform llppropri,ate hydraulic computations. <br /> <br />3. Review right-of-way aspect> relative to flood hazard. <br /> <br />4. Determine various potential alternate solutions and analyze for <br />costs and benefits. <br /> <br />5. Review legal aspects of pl~ns and present flooding hazard. <br /> <br />6. Prepare a short written report to summarize Phase A work prior <br />to Phase B work. <br /> <br />B. Prel imlnary Design. <br /> <br />J. Prepare final hydrological studies to determine the magnitude <br />and volume of flood runoff for design purposes,. <br /> <br />2. Develop des ign criteria for the subject project. <br /> <br />3. Process suitable topographic mclpplng having a I" ~ 200' scale <br />with a contour intervals of two Fe"t for plan and pl-ofile purposes. <br /> <br />4. Develop the approximate chetnnel and flood pl.ain requirements for <br />review by local officials. <br /> <br />5. Prepare plan and profiles of the stream channel and flood plain <br />complete with flood profile water s,urface elevations. <br /> <br />6. Prepare preliminary design drawings with a suitable written report. <br /> <br />BASIN PROBLEMS AND OPPORTUNITIES <br /> <br />The Big Dry Creek basin Is the largest urban basin undertaken to date <br />for master planning by the District. At th.. pres"nt time it: is mostly <br />
The URL can be used to link to this page
Your browser does not support the video tag.