My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04268
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04268
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:45:46 PM
Creation date
10/5/2006 12:30:28 AM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Stream Name
South Platte
Basin
South Platte
Title
Union Avenue Boat Drop - Project Proposals, Contract Info & Billing Invoices - Part 2
Date
1/1/1983
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />Project C8847 <br />Disk 561C <br />KRL <br /> <br />SECTION lA - SPECIAL PROVISIONS <br /> <br />INDEX <br /> <br /> 1. Commencement, Prosecution and 12. Equipment Ownership and <br /> Completion of Work Operating Expense Schedule <br />. 2. Liquidated Damages (1981 JUN OCE) <br /> 3. Contract Drawings, Maps and 13. Contractor Quality Control <br /> Specifications 14. Funds Available for Payments <br /> 4. Shop Drawings 15. Availability and Use of <br /> 5. Physical Da ta Utility Services <br /> 6. Layout of Work 16. Payment for Materials <br /> 7. Quantity Surveys Delivered Offsite <br /> 8. Certificates of Compliance 17. Performance of Work By <br /> 9. Time Extensions Contractor <br /> 10. Damage to Work 18. Variations in Estimated <br /> 11. As-Built Drawings Quantities - Subdivided Items <br /> <br />. <br /> <br />. <br /> <br />Attachments: <br />Sample of Typical Construction Quality Control Daily Report <br />Submittal Register <br />Submittal Form <br />Streamflow Chart <br /> <br />1. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: The Contractor <br />will be required to commence work under this contract within fifteen (15) <br />calendar days after the date of receipt by him of Notice to Proceed, to <br />prosecute said work diligently, and to complete the entire work ready for use <br />not later than three hundred sixty five (365) calendar days after receipt by <br />him of Notice to Proceed. The time stated for completion shall include final <br />cleanup of the premises. See SECTION: CONSTRUCTION GENERAL, Paragraph 10 <br />for order of work and an outline of critical items. <br /> <br />2. LIQUIDATED DAMAGES: In case of failure on the part of the Contractor <br />to complete the work within the time fixed in the contract or any extensions <br />thereof. the Contractor shall pay to the Government as liquidated damages, <br />pursuant to the clause of this contract entitled "Termination for Default - <br />Damages for Delay - Time Extensions" the sum of two hundred eighty dollars <br />($280.00) for each calendar day of delay. <br /> <br />3. CONTRACT DRAWINGS, MAPS AND SPECIFICATIONS: <br /> <br />3.1 Seven sets of full size contract drawings, maps and specifications and <br />seven sets of half-size bid drawings with copies of amendments) will be <br />furnished the Contractor without charge except applicable publications <br />incorporated into the Technical Provisions by reference. Additional sets <br />will be furnished on request at the cost of reproduction. The work shall <br />conform to the contract drawings and maps set out in the drawing index, all <br /> <br />lA-l <br />
The URL can be used to link to this page
Your browser does not support the video tag.