Laserfiche WebLink
<br />Acknowledgemlmts <br /> <br />This document was prepared by the Floodplain Division of the Stormwater Utility. The editorial <br />assistance and overall guidance of the Stormwatcr Utility Staff is gratefully acknowledged, In <br />addition, we extend our gratitude to the City Cotlllcil and the Storm Drainage Board for their <br />guidance in the adoption and implementation ofthis plan, We thank the citizens of Fort Collins <br />for their input during the public comment period, <br /> <br />We would also like to thank the following departments for their review and helpful comments; <br /> <br />Natural Resources Division, Parks and Recreation Department, Advanced Planning <br />Department, Water and Waste Water Utility, Light and Power, Engineering Department, <br />Transportation Department, Police Services, Larimer County Engineering Department, <br />Colorado Water Conservation Board, the ISO Commercial Risk Services and the <br />Community Rating System, <br /> <br />Public Meetings and Outreach <br /> <br />The Storm Drainage Board recommended adoption of this plan at the October 5,1995 meeting. <br />A Pubic Open House was held on September 28, 1995. <br />A mailing was sent to all floodplain residents in the City on September 22, 1995. <br />Newspaper advertisements were published on SeptembE:r 17 and 24, 1995. <br /> <br />Document Organization and Use <br /> <br />This document consists of two parts; Part A documents the current and ongoing floodplain <br />management program and activities in the City, and; l'art B includes the policy, administrative, <br />and regulatory framework for the management of floodplains in the City of Fort Collins. <br />It is intended that each part can be used independently, however, both parts are written to <br />complement one another and provide a logical progression with regard to the overall floodplain <br />management program in Fort Collins, In additio!l, the guidelines are intended to include all <br />relevant information and provide the documentarion and justification for all management <br />activities and regulatory decisions with regard to floodplain administration. <br /> <br />5 <br />