My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04171
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD04171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:45:31 PM
Creation date
10/5/2006 12:23:57 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
All
Basin
Statewide
Title
Specifications for Photogrammetric Services for Floodplain Studies in Colorado
Date
8/1/1982
Prepared By
CWCB
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />P. Special Provisions. Frequently a project will have a <br />partlcular feature or features which will require that <br />special provisions be made in the performance of the <br />sevices. When this condition exists, the additions or <br />deletions will be so stated within Attachment A to the <br />specifications and outlined in Attachment C as <br />necessary. <br /> <br />IV. TECHNICAL DIRECTIONS AND REQUIREMENTS <br /> <br />The performance of the work required herein shall be <br />subject to the direction of the contracting agency or its <br />representative and to the conditions of these specifications. By <br />these technical directions, it is hoped that the contractor will <br />better understand the purpose and intent of the photogrammetric <br />work. <br /> <br />A. Scope of Work. The contractor shall provide the CWCB <br />wlth a wrltten scope of work and costs as outlined in <br />these specifications and attachments. <br /> <br />B. Contract Terms Not to be Changed. The contractor shall <br />not reconstltute new asslgnment of work to others or <br />change the expressed terms, conditions, or <br />specifications as outlined herein. <br /> <br />C. Time of Completion. It is of utmost importance that <br />all work under this contract be performed expeditiously <br />to insure completion of all work by the contractor <br />within 180 calendar days after award of the contract. <br />Failure to do so will result in a penalty charge of <br />$100 per calendar day and/or removal from the CWCB's <br />mailing list for 1 year. <br /> <br />D. prepaneling. The following procedures shall be <br />required for the accomplishment of prepaneling the <br />project. Contrasting panels shall be used whenever <br />necessary in standard Y or + patterns. <br /> <br />1. The contractor shall provide the vertical and <br />horizontal ground control panel layout. This <br />layout shall include the paneling of all <br />existing USC&GS and USGS benchmarks, county <br />benchmarks (as provided), and known section <br />corners in the area. <br /> <br />2. The contractor shall be responsible for providing <br />all paneling materials and for locating all <br />existing benchmarks within the project area, as <br /> <br />-7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.