My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04171
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD04171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:45:31 PM
Creation date
10/5/2006 12:23:57 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
All
Basin
Statewide
Title
Specifications for Photogrammetric Services for Floodplain Studies in Colorado
Date
8/1/1982
Prepared By
CWCB
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />B. Overlap. The aerial neqatives and photographs for the <br />entire area to be mapped shall have the following <br />overlap: <br /> <br />1. End lap shall be 60% + 5%. <br /> <br />2. Side lap between adjacent flights shall be 30% + <br />10%. <br /> <br />C. photographic Quality. Neqatives and prints shall be <br />clear and sharp 1n detail, of normal density, and of <br />fine-grained quality. They shall be free from stre aks, <br />oil stains, static marks, clouds, cloud shadows, smoke, <br />haze, snow, excessive shadows, and other deficiencies <br />which would interfere with their intended use. <br />Reducing or intensifying of negatives shall not be <br />permi tted. <br /> <br />D. Ground Control. The contractor shall provide by <br />instrument-survey methods the horizontal and vertical <br />ground control necessary for the required mapping <br />accuracy. The vertical ground control and contour <br />designation shall be based on United States Coast and <br />Geodetic Survey (USC&GS) or United States Geological <br />Survey (USGS) Mean Sea Level Datum (MSL) adjusted to <br />the most recent date of record. The horizontal <br />ground control shall be based on a minimum of 2 USC&GS <br />triangulation stations, or the equivalent, and tied to <br />the Lambert Conformal Conic projection for establish- <br />ment of the Colorado State Plane Coordinate System, <br />appropriate zone, with or without Local Datum Adjust- <br />ment wi thin the project area. (See Attachment A.) <br /> <br />A minimum of third order, class I, control accuracy as <br />defined by the National Geodetic Survey (NGS) <br />"Classification, Standards of Accuracy and General <br />Specifications of Geodetic Control, Surveys" shall be <br />used when running the field control by instrument <br />surveys. The ground control surveys shall be <br />supervised by a Land Surveyor licensed in the State of <br />Colorado. <br /> <br />E. Plotter. A modern stereo plotter capable of being <br />operated within a C-factor range of C-1200 to C-2100 <br />will be acceptable for compilation of the topographhic <br />maps and cross sections. The contractor shall state <br />the type of equipment to be used and its operating <br />C-factor for work to be performed. <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.