Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />~ <br /> <br />ENGINEERING, INC 7108-B South Alton Wa~, Englewood, CO 80lle Fhone (303) eel-080<:' / Fax (303) <:'<:'1-4019 <br /> <br />- <br />- <br /> <br />Flannlng <br /> <br />Ita <br /> <br />DeSign <br /> <br /> <br />Ifj <br /> <br />Management <br /> <br />December 9, 1997 <br /> <br />Joseph Kiolbasa, PE <br />Pl,Iblic Works Department Director <br />City of Sterling <br />Centennial Square <br />421 N, 4th Street <br />P,O, Box 4000 <br />Sterling, CO 80751-0400 <br /> <br />RE: City of Sterling and Logan County Flood Hazard Mitigation Feasibility Study <br /> <br />Dear Mr. Kiolbasa: <br /> <br />As we discussed earlier today, ICON Engineering, Inc, has been selected to complete the <br />above referenced project. Our base contract is directly with the State of Colorado through the <br />Colorado Water Conservation District. In order to complete the work for this project, our fees <br />will need to exceed the base contract. It is our understanding that the City of Sterling has <br />funds available to cover our expected overruns. At this time, it is difficult to determine total <br />fees since the environmental work that may be required is not known at this time, It is our <br />recommendation that we proceed with the work on the assumption that additional fees will be <br />made available from the City on a time and materials basis with a not-to-exceed without prior <br />authorization cap of $5,000.00, If you are in agreement with this concept, please sign and <br />return one copy of the enclosed Agreement, which will serve as our Notice-to-Proceed, <br /> <br />We look forward to working with you on this very important project. <br /> <br />Sincerely, <br /> <br />Accepted By: <br /> <br />ICON Engineering, Inc. <br /> <br />City of Sterling <br /> <br />~WJ <br /> <br />Penn Gildersleeve, PE <br />Principal <br /> <br />Joseph Kiolbasa, PE <br />Public Works Director <br /> <br />cc: Larry Lang, CWCB <br />