Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />'In. Description of the Proposed Project <br />A. Project location (attach maps and photos) <br />(show specifil;ally where the overall project and its individual components <br />will be located) <br />B. Project Description <br />. Project objectives and how it will reduce or eliminate the risk of future <br />damages <br />. Preliminary engineering design <br />. Scope of work (labor & materials) <br />. If applicable, relationship of this project to a bigger project <br />. Future maintenance and operation requirements <br />C. Brief Discussion of Remaining Work Needed Before Final Design and <br />Construction (if any) <br />(Is there anything else that needs to be accomplished before it is possible to <br />proceed with final design and construction/implementation?) <br />D. Attach Completed ReconnaissanceJReview Report for Floodplain <br />Management (FEMA Form 90-62) <br />(This form has been attached to the outline for your information) <br /> <br />IV. Cost Estimate <br />A. Cost Breakdown <br />B. Description of Non-FEMA Funding Sources (attach Letters of Funding <br />Commitment from those sources) <br />C. Estimated Expenditures <br />. Project management <br />. Engineering <br />. Design <br />. Labor <br />. Materials & supplies <br />. Equipment <br /> <br />V. Cost Effectiveness <br />A. Useful Life of Project <br />B. Annual Maintenance Cost <br />C. Frequency and Severity of Recent Flood Events (1997 event if applicable, <br />other recent major events whether 1997 is applicable or not) <br />D. Estimate of Dollar Amount of Damage to be Prevented <br />E. Justification to Support Estimate <br />F. Number ~f People Protected by Proposed Project <br />G. Value of Property Protected by Proposed Project <br />