Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />, . <br /> <br />Sterling Flood Hazard <br />Mitigation Feasibility Study <br /> <br />ICON Engineering, Inc. <br />EFFECTIVE 1998 <br />ENGINEERING HOURLY RATE SCHEDULE <br /> <br />Outlined in the following table are the average hourly billing rates which we will apply to this <br />project. Hourly rates from the table were used to develop the fee proposal for the Base Fee <br />Scope, Miscellaneous direct costs such as mileage, reproduction, and per diem are not <br />charged for this project. <br /> <br />Labor Classification <br /> <br />Personnel <br /> <br />Project Title <br /> <br />Hourly Rate <br /> <br />Senior Professional <br /> <br />Penn Gildersleeve Principal-In-Charge $97 <br />Matthew Ursetta Project Manager $85 <br />Kent Barringer Task Leader - Civil $80 <br />Calvin Heinly Task Leader - Surveys $68 <br />Rick Rome Project Engineer $68 <br />Curtis Neufeld Design Engineer $68 <br />Troy Carmann EngineerIField Inspector $58 <br />Ed Ammerman Project Surveyor $52 <br /> CADD Technician $55 <br /> 2-Man Crew $85 <br />Linda Olson $40 <br /> <br />Principal In Charge <br /> <br />Project Manager <br /> <br />Professional <br /> <br />Technician!Draftsman <br />Survey Crew <br /> <br />Administration <br /> <br />Base rates shown are valid through 1998. Rates are anticipated to increase by 5% for time <br />frames beyond 1998. <br /> <br />lJi ad- <br /> <br />Authorized Signature <br /> <br />0:4110/proposallmisc/stIcwcb.doc <br />