Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />illustration of the 100-year peak flow hydrographs for the present and <br /> <br /> <br />future conditions at Design Point D-6, Dutch Creek at Platte Canyon <br /> <br /> <br />Road. Peak flows for the 2-, 5-, 10-, and 50-year storms future con- <br /> <br />ditions are also plotted. <br /> <br />Routed peak at D-6 <br /> <br />Total basin hydrograph <br />at D-6 <br /> <br />7,389 cfs <br /> <br />I <br /> <br />6,890 cfs <br /> <br />Flood Routing <br /> <br />A summary of the peak flows at each of the design points for each fre- <br />quency is presented in Table 2. <br /> <br />I <br /> <br />I <br /> <br />After obtaining the storm hydrographs for the individual sub-basins, <br />it was necessary to combine these flows in such a manner to determine <br />the total flows throughout all of the channels. The travel time was <br />calculated for each reach, using an estimated velocity of 6 feet per <br />second and was then rounded to the nearest 10 minute interval. The inflow <br />hydrograph to the sub-basin was delayed by this time interval and combined <br />with the sub-basin hydrograph. <br /> <br />A summary of peak flows for the present and future developed conditions <br /> <br /> <br />for each frequency is also provided on the Discharge Probability Curves <br /> <br />shown on Figures BelA through BelD in Appendix B. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Only the 100-year discharges for the present and for the future condi- <br /> <br /> <br />tion were routed. Flows for the 2-, 5-, 10-, and 50-year storms were <br /> <br /> <br />interpolated, using the subbasin hydrographs for these frequencies as <br /> <br />a guide to the relative magnitudes of flow. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />One hundred year discharges for the future condition were routed through <br /> <br /> <br />Beer's Sisters' Reservoir on Coon Creek and through Johnson Reservoir. <br /> <br /> <br />An attempted routing through Grant "A" Lake showed that the dam would <br /> <br /> <br />be overtopped, and so was not considered. Considerable enlargement of <br /> <br /> <br />the spillway would be required to pass the 100-year future runoff. <br /> <br />I <br /> <br />I <br /> <br />The 100-year discharges for the present condition were also routed through <br /> <br /> <br />the same reservoirs and in this instance Grant "A" Lake was adequate; <br /> <br /> <br />however, the water surface was within a foot of overtopping the dam. <br /> <br />I <br /> <br />I <br /> <br />For purposes of comparison, a 100-year storm hydrograph for the total <br /> <br /> <br />basin at D-6 was computed. The sub-basin above D-l was omitted because <br /> <br /> <br />of its significantly different characteristics and because it would not <br /> <br /> <br />contribute to the peak flow due to the long travel time. <br /> <br />I <br /> <br />I <br /> <br />8 <br />