|
<br />.
<br />
<br />Colorado Water Conservation Board
<br />rlood Control and F100dplaIn Management SectIon
<br />
<br />M E M 0 RAN DUM
<br />
<br />TO:
<br />
<br />Bill McDonald, Director
<br />
<br />~\~,
<br />
<br />L/
<br />l-~ 11
<br />4-/""
<br />\/
<br />
<br />rROM:
<br />
<br />SUBJECT:
<br />
<br />DATe:
<br />
<br />I have reviewed the request for a variance from rule(s)
<br />submi tted by
<br />of the
<br />
<br />dated
<br />
<br />, and recei ved by the board on
<br />and have determined that:
<br />
<br />1. The following affected communi ties should be notified by the
<br />applicant in writing:
<br />
<br />.
<br />
<br />2. The estimated changes in water surface elevation, floodplain area,
<br />or flood velocities appear to be (if applicable):
<br />
<br />significant
<br />
<br />insignificant
<br />
<br />3, Approximately
<br />potentially be negatively
<br />(i f applicable)
<br />
<br />people in structures could
<br />affected by approval of the variance
<br />
<br />4, The evidence submItted In accordance with the rule is
<br />
<br />sufficient
<br />for the board to make a decision,
<br />
<br />i"nsuffi cient
<br />
<br />Therefore, I recommend that the request for a variance be
<br />
<br />presented to the board for cons ideration.
<br />
<br />returned to the requestor with deficiencies noted.
<br />
<br />__,__-,-",:->--..---,..~~,;",.__o-,_,~--,""_,__,~""",,,,,-,",W':,.,,..~,i,;......_,,,,,.,,.4':'"~;:.;.:o.;~",-.
<br />
<br />-",-;"<~~,,~:,,,-,
<br />
<br />.
<br />
<br />-13-
<br />
|