My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03947
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03947
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:44:49 PM
Creation date
10/5/2006 12:12:24 AM
Metadata
Fields
Template:
Floodplain Documents
County
Weld
Community
Milliken
Stream Name
Local Drainage
Basin
South Platte
Title
Floodplain Information Report
Date
10/1/1982
Prepared For
Milliken
Prepared By
Simons Li & Associates Inc.
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />" <br /> <br />The second priority should be the Eastern Flow path. Phaaedconstruct1on <br />of Altern...Uv..21nth......,.,t ls conceivabl... but the full benefit. of the <br /> <br />IX. STRE~T IMPROVEMENT PLAN <br /> <br />improvementa would not be realized until the entire project ~as completed. <br />Staged conotructlon in the &astern Plow Path would begin at the a19' <br />'!'hompeon Riv<lr and ,."",k upstr..am t.o the unto" PaetHc Railroad pond. While <br />the major benefits of the ....stern improvements would not be realired until the <br />last phase of construction, starting at the south end of the route would <br />merely transfer that area's flooding problem to a little further north until <br />the projeot w..s completed through to thealg rhompson River. <br />The third priority is Lola Park Tributary Alternative A4. This would <br />eliminate inundation of buildings within the present 100-year flood plain <br />northof!:lmStr....t. <br /> <br />Introduction <br />The street improvement plan for Milliken develops grading and paving <br />d..aigne for Milliken's street ay..tem. The majority of th.. town's streets are <br />pres~ntly unpaved. Street design wae tied to the Milliken drainage etudy <br />because properly designed streets are a critical part of an efficient drainag.. <br />syst..... Guidelines for deoign c...e frO/ll "Drainag..and street Design Ma.nual <br />for the Town of Milliken, Colorado." <br /> <br />The Wast..rn Flow Path is the fourth priority. Proposed 1rnproV'lllents here <br />would confine runoff to Quentine Avenue keeping adjacent homes safe from <br />flooding. <br /> <br />I <br />I <br />I <br />, <br />I <br />, <br />I <br /> <br />De..ign <br />The basic concept behind the street improvement plan was to design the <br />streets to carry the l0-year return period discharge within curb height at ao <br />close to existing grade as possible. ~ street fiow net was developed based on <br />existing grades and a typical residential street cross section (35-foot <br />pavement width plus curb and gutter). The flow net indicated flow direction <br />and street capacity. pellkrunoffratefrOll\eachcityb10ckforthel0-year <br />atorm was estimated by the rational method and diapers..d into the streete <br />along with incoming atorm water flows from the upland fields. This indicated <br />which streets had inadequate capacity and whsre water would be concentrated. <br />Grade changes _re .....de on a trial and error basis until the 10-ye~r di"chllrge <br />could be routed throu9h to>Inon the streets. <br />~rom the finali=ed flow net (rigu~p 17) grll<!PR w~r.. Me~9..d with vertical <br />pa~abolic curves of equal tangents. The preli~nary street designs tor e..cn <br />of Milliken's streets are <leu,Ued in Plat.... 2 through 14. Plate 1 is the k"y <br />to the loclltionof each detailed street design plate lInd gives ane><p1a nation <br />of th.. symbols &nd abbreviations used. P1"te 15 shows cross sections of typi- <br />csl collector and rssid..ntilll streets. Broad street was designed ae a oollec- <br />terst.r"et. 11.11 other street", in to"", were designe<l a" r"e1d"ntia1 "treeta, <br />althou~h Weld County should be contacted concerning the ",tatus cf Irene, <br />QUentine, and Altce Av..nu.... prior to final design since th..y are county roads. <br />Crosspana direct curb flows at intersections. They will be used as a <br />~eanS to more evenly distribute flow throughout the street system. ~dditiona1 <br />drainage ..tructures will be necessary at points of concentration to route flow <br />to points where it Cd" be convey..d out of town. ~ 36-incll corrug-"ted ....t.al <br />culvert runs ,,,,,,thu,,d,,r Kig-hway60 froOl the "outheaat corner of t he Grace <br />Avenue and Highway 60 intersection. North of the highway the culvert is <br />
The URL can be used to link to this page
Your browser does not support the video tag.