My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03947
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03947
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:44:49 PM
Creation date
10/5/2006 12:12:24 AM
Metadata
Fields
Template:
Floodplain Documents
County
Weld
Community
Milliken
Stream Name
Local Drainage
Basin
South Platte
Title
Floodplain Information Report
Date
10/1/1982
Prepared For
Milliken
Prepared By
Simons Li & Associates Inc.
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />n <br /> <br />.. <br />,. <br /> <br />Tabl~ 17 oontinuo~. <br /> <br />Table 18. Lola Park Tributary ~ltern.tlve as ~ry of Coot Estimate. <br /> <br />It.... <br /> <br />Quantity <br /> <br />Uniteoat <br /> <br />Total Coat <br /> <br />It..", <br /> <br />Q..!antity tJnitCost ~t..lCo8t <br />, LwopSUm , 3,000 <br />220lf <br />each , 56.00/lf 49,000 <br />, Lump Sum 15,000 <br />3.500 U , 2.25!lt 8,000 <br />, LulI\pSUm 9.000 <br /> <br />Annual Coat <br />(50-year service life, 7-3/8 percent) <br /> <br />$ \8.000 <br /> <br />Enlarge fire atation pon~ <br /> <br />Operation and Maintenance <br /> <br />'" <br /> <br />Four 42-inch ReI' from <br />pond to Highway 60 dicth <br /> <br />TO'I'AL i'lNNUAL COST <br /> <br />$18,400 <br /> <br />Modify Highway 60 ditch <br /> <br />Modify Thompson and <br />PbtteDitch <br /> <br />Great Weatern Railroad pond <br /> <br />TWo 54-inch ReI' under <br />Union pacific Railroad <br />elllbanl<....nt (with headwall <br />andripr"p) <br /> <br />451t <br />each <br /> <br />$28S.00/lf <br /> <br />26,000 <br /> <br />Channel to Little <br />Thompson River <br /> <br />GOOlf <br /> <br />$ 12.00/1f <br /> <br />7.000 <br /> <br />Total Construction Cost <br /> <br />$117.000 <br /> <br />Engineering and Contingenclea <br />[30 percent of construction coatsl <br /> <br />35,000 <br /> <br />Land ~quiatt1on <br />Agrtcultural (~.S acres a~ $4,000 per acre) <br /> <br />22,000 <br /> <br />Legal, Fiscal and Administration <br />(S percent of construction, eng1neering and <br />conting8nct8a, and land coats) <br /> <br />9,000 <br /> <br />TOTAL COST <br /> <br />$183,000 <br /> <br />Annual coat <br />(50-year service l1fe, 1-3(8 peroent) <br /> <br />$13,\100 <br /> <br />Operatton and Ma1ntenance <br /> <br />'"" <br /> <br />S \4,200 <br /> <br />TOTIILAllNUALCOS'l' <br />
The URL can be used to link to this page
Your browser does not support the video tag.