Laserfiche WebLink
<br />n <br /> <br />.. <br />,. <br /> <br />Tabl~ 17 oontinuo~. <br /> <br />Table 18. Lola Park Tributary ~ltern.tlve as ~ry of Coot Estimate. <br /> <br />It.... <br /> <br />Quantity <br /> <br />Uniteoat <br /> <br />Total Coat <br /> <br />It..", <br /> <br />Q..!antity tJnitCost ~t..lCo8t <br />, LwopSUm , 3,000 <br />220lf <br />each , 56.00/lf 49,000 <br />, Lump Sum 15,000 <br />3.500 U , 2.25!lt 8,000 <br />, LulI\pSUm 9.000 <br /> <br />Annual Coat <br />(50-year service life, 7-3/8 percent) <br /> <br />$ \8.000 <br /> <br />Enlarge fire atation pon~ <br /> <br />Operation and Maintenance <br /> <br />'" <br /> <br />Four 42-inch ReI' from <br />pond to Highway 60 dicth <br /> <br />TO'I'AL i'lNNUAL COST <br /> <br />$18,400 <br /> <br />Modify Highway 60 ditch <br /> <br />Modify Thompson and <br />PbtteDitch <br /> <br />Great Weatern Railroad pond <br /> <br />TWo 54-inch ReI' under <br />Union pacific Railroad <br />elllbanl<....nt (with headwall <br />andripr"p) <br /> <br />451t <br />each <br /> <br />$28S.00/lf <br /> <br />26,000 <br /> <br />Channel to Little <br />Thompson River <br /> <br />GOOlf <br /> <br />$ 12.00/1f <br /> <br />7.000 <br /> <br />Total Construction Cost <br /> <br />$117.000 <br /> <br />Engineering and Contingenclea <br />[30 percent of construction coatsl <br /> <br />35,000 <br /> <br />Land ~quiatt1on <br />Agrtcultural (~.S acres a~ $4,000 per acre) <br /> <br />22,000 <br /> <br />Legal, Fiscal and Administration <br />(S percent of construction, eng1neering and <br />conting8nct8a, and land coats) <br /> <br />9,000 <br /> <br />TOTAL COST <br /> <br />$183,000 <br /> <br />Annual coat <br />(50-year service l1fe, 1-3(8 peroent) <br /> <br />$13,\100 <br /> <br />Operatton and Ma1ntenance <br /> <br />'"" <br /> <br />S \4,200 <br /> <br />TOTIILAllNUALCOS'l' <br />