Laserfiche WebLink
<br />" <br /> <br />" <br /> <br />T~ble 10. Western Fl~ path Alternative 3 Summary of Coat EstimAte. <br /> <br />Table 11. Western Flow ~th Alternative 4 ~ry of Cost Estimate. <br /> <br />It..m <br /> <br />Itll'" <br /> <br />Qu..ntity <br /> <br />Unit Cost <br /> <br />Total Cost <br /> <br />Quantity UnitOost Total Cost <br />'" U S48.QO/lf S 29,000 <br />" U <br />..ach S70.00/lf 22,000 <br />'" U $15.00/11' 5,000 <br />'" U <br />each $10.00/lf 14,000 <br /> <br />DlversionDitch <br /> <br />Base grad.. preparation <br /> <br />4,2800,/ <br /> <br />Four 42-inch ReP (with <br />headwall and riprap) <br /> <br />Concrete pavement, <br />curb and <]Utter <br /> <br />1,36Slf <br /> <br />Channel to County <br />Road46Jf4 <br /> <br />Lawn replacement <br /> <br />7,700 sf <br /> <br />I <br />. <br />, <br />I <br />, <br /> <br />Total Construction Cost <br /> <br />Four 42-inch ReF (with <br />headwall and rlprap) <br /> <br />Engineering and Contingencies <br />(30 percent of construction costsl <br /> <br />Channel from County <br />Road463/4t<> <br />llighw"y60 <br /> <br />3.000 <br /> <br />Legal. Fiscal and Administration <br />(5 percent of construction, engineering and <br />contingencies, and land costll <br /> <br />600lf <br /> <br />$S.OO/lf <br /> <br />Thompson and Platte <br />and Beeline Ditch <br />crossing <br /> <br />TOTAL COST <br /> <br />, <br /> <br />r..urnp Sum <br /> <br />15.000 <br /> <br />Total COnstruction Cost <br /> <br />$ 86.000 <br /> <br />I\nnual COst <br />(50-year service lih, 7-J/6percent) <br /> <br />Engineering and Contingencies <br />130 percent of conetruction oosts) <br /> <br />26,000 <br /> <br />Operation and Maintenance <br /> <br />Leqal, riacal and I\dm1niRtratinn <br />(5 percent of construction, ..n"ln""rin<> ~,,'1 <br />conting<>ncies.andland<,'Ostel- . <br /> <br />TOTI\L ANNUAL COIlT <br /> <br />$ 4.50/cy <br /> <br />$ '~.OOO <br /> <br />$95.00/lf <br /> <br />130,000 <br /> <br />$ 0.35/sf <br /> <br />3,000 <br /> <br />$152,000 <br /> <br />46.000 <br /> <br />10,000 <br /> <br />$206,000 <br /> <br />$15,600 <br /> <br />" <br /> <br />$15,800 <br /> <br />6,000 <br /> <br />TOTA.L COST <br /> <br />$120,000 <br /> <br />I\nnual Cost <br />(SO-year service life. 7-3/6 percent] <br /> <br />$ ~,100 <br /> <br />Operation and Maintenance <br /> <br />'"" <br /> <br />TOTAL ANNUI\L COST <br /> <br />$ 9,500 <br />