My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03928
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03928
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:44:46 PM
Creation date
10/5/2006 12:11:54 AM
Metadata
Fields
Template:
Floodplain Documents
County
Logan
Community
Sterling
Stream Name
Pawnee Creek
Basin
South Platte
Title
Flood Hazard Mitigation Feasibility Study
Date
2/1/1998
Prepared For
Logan County
Prepared By
ICON Engineering, Inc.
Floodplain - Doc Type
Project
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The Contractor is respon"ible for providing workmen's compensation coverage and <br />unemployment compensation coverage for all of its employees to the extent required by law, <br /> <br />8. Termination of Contractor for Cause <br /> <br />A. The State may terminate the contract, in whole or in part for cause, by giving notice to the <br />Contractor of such termination at least five (!5) working days before the effective date of <br />such termination and "pecifying the effectivEl date thereof. Any or all of the following <br />reasons shall constitute cause for the State to terminate the contract. (1) Failure for any <br />reason of the Contractor to fulfill in a timely and proper manner its obligations under the <br />contract and attachments; (2) Sub-mission by the Contractor to the State of reports that <br />are incorrect or incomplete in any material respect; (3) In-effective or improper use of <br />funds provided under Ihis agreement; and, (4) Suspension, reduction, or termination of <br />the grant to the State Linder which this contract is made, or the portion the,reof delegated <br />by this agreement. <br /> <br />B. The Contractor may terminate this ract for cause if the Contractor is unwilling or unable <br />to comply with such additional conditions as may be lawfully imposed. The Contractor <br />must give notice to the State of such termination at least five (5) working days before the <br />effective date of such termination and specify the effective date thereof. <br /> <br />C. In the event of any termination of the contract, the followin9 will apply: (1) The State will <br />require the Contractor to ensure that adequate arrangements have been made for the <br />transfer of the agency's activities and inventory to anothef Contractor 01" to the State. <br />Inventory shall include client records, supplies, materials, Elquipment, vehicles and other <br />items purchased with ~;tate or federal funds per state and federal procedures, laws and <br />regulations; (2) The Contractor shall be entitled to compensation for any unreimbursed <br />expenses reasonably and necessarily incurred in the satisfactory performance of the <br />contract. Notwithstanding the above, the Contractor shall not be relieved of liability to the <br />State for damages sustained by the State, by virtue of any breach of the agreement by <br />the Contractor, and thll State may withhold any reimbursement to the Contractor for the <br />purpose of set-{)ff until such time as the exact amount of damages due to the State from <br />the Contractor is agrelld upon or otherwise determined. <br /> <br />9. Termination for Convenience of State.. The State may terminate the contract at any time it <br />determines that the purpose of the distribution of funds under the contract would no longer be <br />served by completion of the project. The State shall effect such termination by giving written <br />notice of the termination to the Contractor and specifying the e,ffective date thereof, at least <br />twenty (20) days before the effective date of such termination, Iln that event all materials and <br />documents as described in paragraph 8 above shall, af the option of the State, become its <br />property and the Contractor ~;hall be entitled to receive just and equitable compensation for any <br />satisfactory work completed on such materials and documents. If this contract is terminated due <br />to the fault of the Contractor, paragraph 8 hereof relative to temlination shall apply. <br /> <br />10. Chanqes in SCODe of Services.. The State may, from time to time, request changes in the <br />scope of services of the Contractor to be performed hereunder as set forth in the grant award <br />letter. Such changes in thll scope of services of the Contractor shall be in writing via the <br />issuance of an amended award letter. and shall be incorporated without written amendment to <br />this contract. Any revisions to the scope of services initiated by the Contractor must be <br />approved by the State. <br /> <br />Page ...:tof _\L Pag"s <br />
The URL can be used to link to this page
Your browser does not support the video tag.