Laserfiche WebLink
<br />Stat~nent of Qualifications <br /> <br />REPRESENTATIVE EXPERIENCE (Cont.) <br /> <br />. Cypress Creek and tributaries KI45-00-00, KI52-00-00, and KI59-00-00. <br />Conditional Letter of Map Revision for Friendswood Development Company. <br /> <br />· Letter of Map Revision, Wood Trace, Montgomery County, Texas. <br /> <br />. River Flood Study, Merida, Venezuela. Performed flood study and design of embankment <br />protection for a reach of the Chama River in Merida State, Venezuela. <br /> <br />· Flood Control Feasibility Study, Falfurrias, Texas for the U.S. Army Corps of <br />Engineers, Galveston District. Performed control feasibility study of Palo Blanco and <br />Cibolo creeks in the vicinity of Falfurrias with a total drainage area of600 square miles <br />including planning and preliminary design of flood control and recreational facilities, <br />calculation of benefits and costs for project alternatives, and preparation of a draft report and <br />exhibits. <br /> <br />· City of Houston/Harris County Storm Water NPDES Permit Application, Houston, <br />Harris County, Texas. Assisted the city and county in preparation of supporting <br />information, analysis of data, and preparation of perrnit application. <br /> <br />. Comprehensive Study of Drainage of Houston Metropolitan Ar'ea, Texas for the <br />HCFCD and the City of Houston, This master drainage plan covers seven watersheds <br />totaling approximately 680 square miles. Acted as Project Manager for one watershed and <br />Technical Advisor for two other watersheds. <br /> <br />· Drainage Master Plan, State Reclamation Permit and Corps of Engineers License for <br />5,400-Acre Cineo Ranch Development, Harris County, Texas. Detailed hydraulic and <br />hydrologic analysis and design. Designed in-channel sedimentation control structures. <br /> <br />· Comprehensive Study of Drainage for Metropolitan Houston, Buffalo Bayou Watershed <br />(Turning Basin to Barker Dam). <br /> <br />· Preliminary Engineering for Drainage, Water, and Wastewater Systems for Fondren <br />Southwest, Greenbriar North, Bear Creek Village, Kingwood, and The Woodlands <br />Developments, Houston, Texas. <br /> <br />· Master drainage plans, floodplain studies, and drainage design for land development projects <br />include the following: <br /> <br />· Kingwood, Harris County, Texas (18,000 acres) <br />· Clear Lake City, Harris County, Texas (20,000 acres) <br />· Copperfield, Harris County, Texas (1,800 acn~s) <br />. Greens Landing, Hanis County, Texas (1,100 acres) <br />. The Woodlands, Montgomery County, Texas (20,000 acres) <br />· Crighton Park, Montgomery County, Texas (3,000 acres) <br />· Cinco Ranch, Fort Bend County, Texas (5,400 acres) <br />· West Keegans Bayou Improvement District, Fort Bend Coun~y, Texas (2,300 acres) <br /> <br />Turner Collie & Braden Inc, <br />