<br />Stat~nent of Qualifications
<br />
<br />REPRESENTATIVE EXPERIENCE (Cont.)
<br />
<br />. Cypress Creek and tributaries KI45-00-00, KI52-00-00, and KI59-00-00.
<br />Conditional Letter of Map Revision for Friendswood Development Company.
<br />
<br />· Letter of Map Revision, Wood Trace, Montgomery County, Texas.
<br />
<br />. River Flood Study, Merida, Venezuela. Performed flood study and design of embankment
<br />protection for a reach of the Chama River in Merida State, Venezuela.
<br />
<br />· Flood Control Feasibility Study, Falfurrias, Texas for the U.S. Army Corps of
<br />Engineers, Galveston District. Performed control feasibility study of Palo Blanco and
<br />Cibolo creeks in the vicinity of Falfurrias with a total drainage area of600 square miles
<br />including planning and preliminary design of flood control and recreational facilities,
<br />calculation of benefits and costs for project alternatives, and preparation of a draft report and
<br />exhibits.
<br />
<br />· City of Houston/Harris County Storm Water NPDES Permit Application, Houston,
<br />Harris County, Texas. Assisted the city and county in preparation of supporting
<br />information, analysis of data, and preparation of perrnit application.
<br />
<br />. Comprehensive Study of Drainage of Houston Metropolitan Ar'ea, Texas for the
<br />HCFCD and the City of Houston, This master drainage plan covers seven watersheds
<br />totaling approximately 680 square miles. Acted as Project Manager for one watershed and
<br />Technical Advisor for two other watersheds.
<br />
<br />· Drainage Master Plan, State Reclamation Permit and Corps of Engineers License for
<br />5,400-Acre Cineo Ranch Development, Harris County, Texas. Detailed hydraulic and
<br />hydrologic analysis and design. Designed in-channel sedimentation control structures.
<br />
<br />· Comprehensive Study of Drainage for Metropolitan Houston, Buffalo Bayou Watershed
<br />(Turning Basin to Barker Dam).
<br />
<br />· Preliminary Engineering for Drainage, Water, and Wastewater Systems for Fondren
<br />Southwest, Greenbriar North, Bear Creek Village, Kingwood, and The Woodlands
<br />Developments, Houston, Texas.
<br />
<br />· Master drainage plans, floodplain studies, and drainage design for land development projects
<br />include the following:
<br />
<br />· Kingwood, Harris County, Texas (18,000 acres)
<br />· Clear Lake City, Harris County, Texas (20,000 acres)
<br />· Copperfield, Harris County, Texas (1,800 acn~s)
<br />. Greens Landing, Hanis County, Texas (1,100 acres)
<br />. The Woodlands, Montgomery County, Texas (20,000 acres)
<br />· Crighton Park, Montgomery County, Texas (3,000 acres)
<br />· Cinco Ranch, Fort Bend County, Texas (5,400 acres)
<br />· West Keegans Bayou Improvement District, Fort Bend Coun~y, Texas (2,300 acres)
<br />
<br />Turner Collie & Braden Inc,
<br />
|