My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03803
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03803
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:44:24 PM
Creation date
10/5/2006 12:04:57 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Stream Name
All
Basin
Statewide
Title
Floodplain Study Review and Designation program - SOQ
Date
4/7/2000
Prepared For
State of Colorado
Prepared By
Turner Collie & Braden Inc.
Floodplain - Doc Type
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Sta~ment of Qualifications <br /> <br />REPRESENTATIVE EXPERIENCE (Cont.) <br /> <br />. Flood Insurance Studies of Madison and St. Clair Counties, Illinois for U.S. Army <br />Corps of Engineers, St. Louis District. <br /> <br />. Southeast Water Purification Plant for the City of Houston, Tl~xas. Detention basin <br />controlling an 800-acre watershed. Provided preliminary engineering design of flood control <br />dams and other detention structures. <br /> <br />. Fairfield Regional Detention Facility (3.6-square-mile drainag1e area) in Harris County, <br />Texas for Friendswood Development Compnny. Provided preliminary engineering design <br />of flood control dams and other detention structures. <br /> <br />. Design of Water Quality Detention Facility for the 300-Acre Brookwood Development <br />in Pasadena (Clear Lake City), Texas. Project Engineer for hydraulic ten acre-feet design <br />of an off-channel water basin. Provided preliminary engineering design of flood control <br />dams and other detention structures. <br /> <br />Flood control feasibility studies for the U.S. Army Corps of Engineers. Projects include the <br />following: <br /> <br />. Type 205 Flood Control Feasibility Study, Nacogdoches, Texas. Involved two <br />streams with a total drainage area of 30 square miles. <br /> <br />. Flood Control and Flood Plain Studies of Oso Creek, Robstown, Texas. Involved <br />26 miles of channels, <br /> <br />. Millican Lake Hydrology Report, Navasota River in Cl,ntral Texas. Involved <br />evaluating a proposed impoundment of more than 1.5 million acre-feet of storage for <br />flood control and water supply. <br /> <br />· Indefinite Delivery Contract, Memphis Tennessee Area. Involved studying <br />small watersheds. <br /> <br />· Floodplain appeals to FEMA (Letters of Map Amendment and Letters of Map Revision) for <br />Various Communities and Developers. Projects of this type include the following: <br /> <br />. Map Revision to Farmers Branch Creek (ten square miles) for the City of Fanners <br />Branch, Texas. <br /> <br />. Letters of Map Revision, Lake Ridge, Cedar Hill, Texas. <br /> <br />. Horsepen Bayou Letters of Map Revision (19 square miles), Harris County, Texas, <br />for Friendswood Development Company (5 Letters of Map Revision). <br /> <br />. Keegans Bayou Letters of Map Amendment, Fort Bend County, Texas, for West <br />Keegans Bayou Improvement District. <br /> <br />Turner Collie & Braden Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.