Laserfiche WebLink
<br />Statement of Qualifications <br />- - <br /> <br />REPRESENTATIVE EXPERIENCE (Cont.) <br /> <br />· United Parcel Service Facility in Colorado Springs, Colorado .- Project Manager performing <br />hydraulic analysis and design of channel improvements to the West Fork of Sand Creek. Included in <br />the project scope was development of existing/proposed conditions computer models. review and <br />revision to the drainage report, plan review, and preparation of design reports. Design <br />recommendations achieved cost-effective implementation of improvements while maintaining <br />parameters specified in the drainage basin master plan. Responsible lor coordination with City of <br />Colorado Springs, client, contractor/subconsultants, and adjacent property owners including <br />construction inspection and [mal approvals initiating warranty period. <br /> <br />. Elm Court Regional Detention Facility in Federal Heights, Colorado -. Project Manager responsible <br />for design of a seventeen acre-foot capacity detention pond, hydrologic and hydraulic analyses, and <br />spillway design. Design was based upon revision to existing hydrology and was subject to Urban <br />Drainage & Flood Control District review/approval. Due to the size of the reservoir, the two-phase <br />project was under the jurisdiction and review ofthe Colorado Department of Natural Resources State <br />Engineer's Office which required flood hazard category classification and dam breach analyses. <br /> <br />. Parker Water and Sanitation District in Parker, Colorado - Project Engineer responsible for design <br />of a fifty-four million gallon wastewater treatIllent plant dIluent reservoir, hydrologic and hydraulic <br />analyses, and spillway design. The reservoir's design was based upon probable maximum precipitation <br />inflow requirements and included computer simulation of dam failure/downstream floodwaves. Due to <br />the size of the reservoir, this project was under the jurisdiction and review of the Colorado Department <br />of Natural Resources State Engineer's Office. <br /> <br />. Erosion Control Analysis for Stetson Hills Development in Colorado Springs, Colorado - Project <br />Engineer responsible for the preparation of the Sand Cn,ek Meander Belt Analysis and preliminary <br />design of erosion control/channelization. Study outlined the potential for lateral migration of Sand <br />Creek in its natural condition and delineated boundaries of the potential migration. Preliminary design <br />measures addressed the inherent erosion potential and provided guidelines for the implementation of <br />conservation procedures. Included in this project was an U.S. Army Corps of Engineers 404 Permit <br /> <br />. Cache la Poudre River Chaunel Improventents in I'ort Collins, Colorado - Project Engineer <br />responsible for design and preparation of construction plans for over one-quarter mile of stream <br />improvements and rechannelization. Experience includes the determination of channel and <br />channel-crossing configurations, determination of floodplain boundaries and erosion control planning. <br /> <br />--- <br /> <br />Turner Collie & Braden Inc. <br />