<br />Statement of Qualifications
<br />
<br />REPRESENTATIVE EXPERIENCE (Cont.)
<br />
<br />· Basin 15 Storm Sewer, Arapahoe County, Colorado. Prepared hydrologic and hydraulic design
<br />and final construction documents for 2,000 feet of 24" and 30" storm sewer, appurtenant structures
<br />and outfall into Cherry Creek. Provided daily coordination and supervision for field observation and
<br />testing, coordination with the contractor and review of contractor pay reguest.
<br />
<br />. Front Range Airport, Watkins, Colorado. Prepared water system, sanitary sewer and storm
<br />drainage design. Project included hydrologic and hydraulic analysis, final design and construction
<br />documents for drainage improvements for Runway 17L135R and access road, including analysis of
<br />three major drainageways consisting of 15 square miles. Design included road culvert crossings,
<br />double 12' x 8' box culvert and 90" storm sewer trunk line. Water system consisted of 270,000-gallon
<br />storage tank, deep well, booster pump station and 2600 If of 12-inch water main. Sanitary sewer
<br />system consisted of a septic system and 1100 If of 6-inch sanitary sewer main.
<br />
<br />. Denver International Airport, Air Cargo Apron, Denver, Colorado. Project Engineer for the
<br />preparation of design and construction drawings for the Air Cargo Apron, and land use planning for
<br />the airline support area. Project included storm sewer collection systems and treatment of stormwater
<br />to improve water quality.
<br />
<br />. Chateaux Beaumar Drainage Improvements, Littleton, Colorado. Prepared construction
<br />documents, for the City and Urban Drainage and Flood Control District that included a regional
<br />detention pond, outfall storm sewer, and local drainage improvements. Construction phase services
<br />were also provided.
<br />
<br />. Pond W-7, Arapahoe County, Colorado. Prepared analysis and construction documents for a
<br />regional detention pond on Windmill Creek.
<br />
<br />· On Call Services, Black Hawk, Colorado. Project Mlmager for the design of arterial streets in the City of
<br />Black Hawk including Gregory Street, Bobtail Street and the reconstruction of the Main/Richman
<br />intersection.
<br />
<br />· Hampden Town Center, Aurora, Colorado. Project Manager for design of a 100-acre mixed use
<br />development. Project includes drainage analysis to resolve on-site and off-sit,e drainage concerns, utility
<br />main extensions, street improvements and improvements to Hampden Avenue.
<br />
<br />· The Reserve at Broadmoor Glen South, Filing Nos. 2,3, and 4. Colorado Springs, Colorado. Project
<br />Manager for design of 50-acre residential subdivision. Project included presentation of overlot grading
<br />plans; final design of street, water, sanitary sewer, and storm drainage utilities; and plan and profile
<br />drawings for a 16-inch water main extension. Responsible for securing approval from the City agencies.
<br />
<br />· Corporate Center, Colorado Springs, Colorado. Project Manager for a IS-acre commercial
<br />development. Project included overlot grading, site layout, water and sanitary sewer main extensions
<br />and drainage improvements.
<br />
<br />· Eagle View Ranch, Elbert County, Colorado. Project Manager for a 575-acre golf course
<br />community. Initial phase of the project included utility infrastructure master planning, preliminary
<br />drainage study and cost estimating,
<br />
<br />Turner Collie & Braden Inc.
<br />
|