My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03800
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:44:23 PM
Creation date
10/5/2006 12:04:50 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Development of A Drainage and Flood Control Management Program for Urbanizing Communities - Part I
Date
9/1/1978
Prepared By
CSU Environmental Resources Center
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />57 <br /> <br />accrues to new development and that accrues to existing development. <br /> <br /> <br />The Special Costs shall be financed by the owners/developers of subdivi- <br /> <br />. <br /> <br />sions requesting approval after adoption of this ordinance and the General <br />Costs shall be financed through the city (or county) general fund. The <br />method of division shall be based on the relationship between the computed <br /> <br />reduction in average annual damages for new developments, and the computed <br />reduction in average annual damages for existing development plus the, <br />minimum monetary equivalent of non-quantifiable considerations to make <br /> <br />the project benefits equal the project cost. The exact method for divid- <br />ing the project costs using the damage-frequency plots of the Initial <br />Drainage Study shall be detailed in the amended criteria maintained by the <br />city (or county) engineer. <br />(c) Fees: <br /> <br />The projected amount and type of new development shall be used to <br /> <br />allocate the Special Costs of the sub-basin and basin Initial Drainage <br /> <br />Study plans. The base ODF for a particular basin or sub-basin shall be <br />computed by dividing the Special Costs of that basin or sub-basin by the <br />sum of the projected development acreage times its development factor as <br /> <br />specified in the following table: <br />Land Use <br />Single-family Residential <br /> <br />Development Factors* <br />1.0 <br /> <br />List of other city (or county) <br />zone classifications <br /> <br />. <br /> <br />. <br />Commercial/Industrial <br /> <br />2.0 <br /> <br />*Note: The Land Use/Development Factor Table is based on the relative <br />. percentages of imperviousness for each zoning classification and <br />should be developed by the city (or county) engineer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.