My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03800
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:44:23 PM
Creation date
10/5/2006 12:04:50 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Development of A Drainage and Flood Control Management Program for Urbanizing Communities - Part I
Date
9/1/1978
Prepared By
CSU Environmental Resources Center
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />50 <br /> <br />(c) Adjustments: <br />(1) Planning and Construction Cost Adjustments: The planning and <br />construction cost adjustment is the adjustment for differences <br />between the off-site drainage fee (ODF) as computed under Section <br />21.05.04 and the sum of the planning fees required under Section <br />2l.05.03(c.l) plus the cost of off-site drainage facilities either <br />inside or outside of the subdivision constructed by the owner/ <br />developer. Off-site drainage facilities include facilities outside <br />of the subdivision boundary, and excess capacity drainage facilities <br />inside the subdivision boundary. The cost of these facilities shall <br />be computed by adding the construction cost of the outside facil- <br />ities to the cost of the excess portion of the inside facilities. <br />The excess portion shall be computed by multiplying the cost of the <br />excess capacity drainage facility by the ratio of inflow from areas <br />upstream of the subdivision to the total flow accommodated by the <br />facility. The city (or county) engineer can define "inflow" and <br />"total flow" in terms of peak discharge rate, volume of discharge, <br />or a combination of both depending on the function of the inside <br />facilities. If the sum of the required planning fees plus the off- <br />site drainage facility cost is less than the ODF, the owner/develop- <br />er shall pay the difference prior to subdivision plat approval as <br />required under this Section 21.05. If the sum of the required <br />planning fees plus the off-site drainage facility cost is greater <br />than the ODF, the owner/developer shall be entitled to the differ- <br />ence. The owner/developer may elect not to be reimbursed this <br />difference and may direct the city (or county) to apply the sum of <br />money he would be reimbursed to pay for ODF's for which he is <br />liable in other subdivisions he is developing within the city (or <br /> <br />" <br /> <br />. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.